background image

PE5T User Manual

24

Securing the Sensors

Connect the sensors to the eco PDU’s front panel sensor ports and secure them 
using sensor mounts, tie wraps, and adhesive cable tie holders. If you use a tie 
wrap to secure the sensor, tighten the tie wrap over the recessed channel on the 
sensor, as shown in the following diagram:

Note:

1. The sensors shown in the above diagram are for reference purposes 

only. The sensors for the eco PDU may look slightly different.

2. Depending on the model and type of sensor, sensor mounts, tie wraps, 

and adhesive cable tie holders may or may not be provided in the 
package.

Содержание NRGence PE Series

Страница 1: ...PDF provided by Conference Room AV ATEN PE5324TA 24 Outlet NEMA Metered Thin Form Factor eco PDU 30A Max ...

Страница 2: ...21 24 42 Outlet eco PDU PE5221T PE5224TA PE5324T PE5342T User Manual www aten com ...

Страница 3: ...ely to cause harmful interference in which case the user will be required to correct the interference at his own expense The device complies with Part 15 of the FCC Rules Operation is subject to the following two conditions 1 this device may not cause harmful interference and 2 this device must accept any interference received including interference that may cause undesired operation FCC Caution A...

Страница 4: ...equential damages resulting from any defect in the software The manufacturer of this system is not responsible for any radio and or TV interference caused by unauthorized modifications to this device It is the responsibility of the user to correct such interference The manufacturer is not responsible for any damage incurred in the operation of this system if the correct operational voltage setting...

Страница 5: ...fety codes as well as deviations for breakers Only connect the PE Device to a grounded power outlet or a grounded system Make sure that the total current input of the connected systems does not exceed the current rating specified on the rating plate of the PE Device There is a risk of explosion if the battery is replaced with an incorrect type Dispose of used batteries according to the relevant in...

Страница 6: ...this manual thoroughly and follow the installation and operation procedures carefully to prevent any damage to the switch or to any other devices on the eco PDU installation Features may have been added to the eco PDU since this manual was published Please visit our website to download the most up to date version Copyright 2016 ATEN International Co Ltd Manual Date 2016 01 29 NRGence and the NRGen...

Страница 7: ...ison Chart 3 Features 4 Power Distribution 4 Remote Access 4 Operation 4 Management 4 Security 5 eco Sensors Energy Management Software 5 Requirements 6 Optional Accessories 7 Sensors 7 Cable Holders 7 Components 8 PE5221T Front View 8 PE5224TA Front View 10 PE5324TA Front View 12 PE5342TB Front View 14 PE5342TG Front View 16 Readout Section 18 Chapter 2 Hardware Setup Before You Begin 19 Rack Mou...

Страница 8: ...gy 32 Connections 32 Configuration 35 User 36 Administrator Information 36 User Information 37 Log 38 The System Log Event List 38 Notification Settings 39 Setup 40 Device Configuration 40 Date Time 46 Security 48 Login Failures 48 Working Mode 48 Session Timeout 48 Account Policy 49 Login String IP Filter Mac Filter 50 Authentication Authorization 53 Private Certificate 54 PDU 56 Firmware File 56...

Страница 9: ... International 62 North America 62 IP Address Determination 63 Specifications 65 PE5221T B 65 PE5221T G 66 PE5221T J 67 PE5224TA 69 PE5224TA Japan 70 PE5324TA 71 PE5324TA Japan 72 PE5342TB 73 PE5342TB Japan 74 PE5342TG 76 Administrator Login Failure 77 Limited Warranty 78 ...

Страница 10: ...t and back panel components are described Chapter 2 Hardware Setup provides step by step instructions for setting up your installation Chapter 3 Basic Operation and First Time Setup explains the procedures that the Administrator employs to set up the eco PDU network environment and change the default username and password Chapter 4 Browser Operation describes how to log in to the eco PDU with an I...

Страница 11: ... http www aten usa com Monospaced Indicates text that you should key in Indicates keys you should press For example Enter means to press the Enter key If keys need to be chorded they appear together in the same bracket with a plus sign between them Ctrl Alt 1 Numbered lists represent procedures with sequential steps Bullet lists provide information but do not involve sequential steps Indicates sel...

Страница 12: ...cs of each model are shown in the table on page 3 The NRGence eco PDUs offer real time power measurement and threshold alerts allowing you to monitor the PDU s power status bank status and circuit breakers either at the PDU device or from practically any location via a TCP IP connection Installation and operation is fast and easy plugging cables into their appropriate ports and user friendly brows...

Страница 13: ...resources in the most efficient way possible Note 1 Sensors are optional accessories A sensor enabled installation is required to generate a more complete energy efficient data and chart Higher sensor installation density is helpful to generate more accurate data See Optional Accessories page 7 for further information 2 Circuit breaker monitoring is only available on models with 30 32 amps 3 eco P...

Страница 14: ...A L6 20p 21 PDU Bank 15A Max 12A UL de rated 20A Max 16A UL de rated 20A Max 16A UL de rated PE5224TA NEMA 5 20P 24 24 x NEMA 5 20R PDU Bank 20A Max 16A UL de rated 20A Max 16A UL de rated PE5324TA NEMA L5 30P 24 24 x NEMA 5 20R PDU Bank 15A Max 12A UL de rated 30A Max 24A UL de rated PE5342TB NEMA L6 30P 42 36 x IEC320 C13 6 x IEC320 C19 PDU Bank Per C13 Duplex Receptacles 15A Max 12A UL de rated...

Страница 15: ...evices circuit breaker Supports button mount on the rear of the PDU for easy installation Remote Access Remote power control via TCP IP and a built in 10 100 Ethernet port Network Protocols TCP IP UDP HTTP HTTPS SSL SMTP DHCP NTP DNS auto sense Ping eco PDU Power Management software eco Sensors Supports SNMP Manager V1 V2 V3 Operation Supports multiple power control methods Wake on LAN System afte...

Страница 16: ... language support English Traditional Chinese Simplified Chinese Japanese German Italian Spanish French Russian Korean Portuguese Note Circuit breaker and bank level monitoring only available on 30A 32A models Security Two level password security Strong security features include strong password protection and advanced encryption technologies 128 bit SSL Remote authentication support RADIUS eco Sen...

Страница 17: ...g of attached computers the computer s BIOS must support Wake on LAN or System after AC Back For Safe Shutdown The computer must be running Windows Windows 2000 or higher or Linux The Safe Shutdown program available by download from our website or on the software CD included must be installed and running on the computer ...

Страница 18: ...curate data Available sensors are show in the table below Sensor Management Sensors can be managed via the eco PDU s built in graphical user interface GUI or with the NRGence eco Sensors software that can be downloaded from the ATEN website The download link can be found on the software CD provided with the eco PDU package Cable Holders Cable holders are optional accessories For added safety use A...

Страница 19: ...PE5T User Manual 8 Components PE5221T Front View 2 5 1 3 4 ...

Страница 20: ...nsor Ports External sensors plug into these two RJ 11 ports 4 LAN Port and LEDs The cable that connects the eco PDU to the LAN plugs in here The Link and LAN LEDs are built into the LAN port Link Lights GREEN to indicate that a connection via the eco PDU s RJ 45 Ethernet port has been established Flashes to indicate data is being transmitted LAN Lights ORANGE to indicate 10 Mbps data transmission ...

Страница 21: ...PE5T User Manual 10 PE5224TA Front View 2 2 5 1 3 4 ...

Страница 22: ...ternal sensors plug into these two RJ 11 ports 4 LAN Port and LEDs The cable that connects the eco PDU to the LAN plugs in here The Link and LAN LEDs are built into the LAN port Link Lights GREEN to indicate that a connection via the eco PDU s RJ 45 Ethernet port has been established Flashes to indicate data is being transmitted LAN Lights ORANGE to indicate 10 Mbps data transmission speed The LED...

Страница 23: ...PE5T User Manual 12 PE5324TA Front View 3 3 6 1 2 4 5 ...

Страница 24: ...will trip Push the switch back to recover normal operation 3 Power Outlets 24 x NEMA 5 20R 4 Sensor Ports External sensors plug into these two RJ 11 ports 5 LAN Port and LEDs The cable that connects the eco PDU to the LAN plugs in here The Link and LAN LEDs are built into the LAN port Link Lights GREEN to indicate that a connection via the eco PDU s RJ 45 Ethernet port has been established Flashes...

Страница 25: ...PE5T User Manual 14 PE5342TB Front View 6 1 2 4 5 3 3 ...

Страница 26: ... the switch back to recover normal operation 3 Power Outlets 42 in total 36 x IEC320 C13 6 x IEC320 C19 4 Sensor Ports External sensors plug into these two RJ 11 ports 5 LAN Port and LEDs The cable that connects the eco PDU to the LAN plugs in here The Link and LAN LEDs are built into the LAN port Link Lights GREEN to indicate that a connection via the eco PDU s RJ 45 Ethernet port has been establ...

Страница 27: ...PE5T User Manual 16 PE5342TG Front View 6 1 2 4 5 3 3 ...

Страница 28: ...h the switch back to recover normal operation 3 Power Outlets 42 in Total 36 x IEC320 C13 6 x IEC320 C19 4 Sensor Ports External sensors plug into these two RJ 11 ports 5 LAN Port and LEDs The cable that connects the eco PDU to the LAN plugs in here The Link and LAN LEDs are built into the LAN port Link Lights GREEN to indicate that a connection via the eco PDU s RJ 45 Ethernet port has been estab...

Страница 29: ...tween the items When a sensor is plugged in the sensor LED lights up 4 Selection Pushbutton Press this button to cycle the selection through the items the LEDs next to the items indicate which one the displays relate to 5 Reset Switch This switch is semi recessed and must be pushed with a thin object such as the end of a paper clip Press and release to reboot the device Press and hold for more tha...

Страница 30: ...e mounted either near the top and bottom of the back panel or the top and bottom ends of the device as shown in the diagram below 1 Important safety information regarding the placement of this device is provided on page 59 Please review it before proceeding 2 Make sure that power to all the devices you will be connecting have been turned off You must unplug the power cords of any computers that ha...

Страница 31: ...For safety reasons the eco PDU should not be installed with the power sockets facing directly up or down and thus should only be installed with the power sockets facing out from a vertical position as shown below Right Wrong Floor Floor ...

Страница 32: ...AN port 3 If you are using sensors in your eco PDU installation connect them to the sensor ports on the unit s front panel Note Sensors are optional Please see Optional Accessories page 7 and the detailed sensor installation diagrams later in this chapter for further information 4 Connect the eco PDU s power cord to an AC power source Note We strongly advise that you do not plug the eco PDU into a...

Страница 33: ...PE5T User Manual 22 3 2 1 1 4 ...

Страница 34: ...wn below For EZ Lok Plug Connectors fit the plug connector onto the input end of a C14 or C20 plug until it clicks in place and then connect the plug with the EZ Lok Connector into the PDU by sliding it directly over and straight into the outlet Note 1 Cable holders are an optional accessory See Cable Holders page 7 2 Use only the ATEN Lok U Plug cable holders or EZ Lok Plugs that have been specif...

Страница 35: ...e wrap to secure the sensor tighten the tie wrap over the recessed channel on the sensor as shown in the following diagram Note 1 The sensors shown in the above diagram are for reference purposes only The sensors for the eco PDU may look slightly different 2 Depending on the model and type of sensor sensor mounts tie wraps and adhesive cable tie holders may or may not be provided in the package ...

Страница 36: ...ser from any platform See First Time Setup page 26 and the following sections in this chapter for full details eco Sensors All eco PDUs support eco Sensors eco PDU Manager Software NRGence eco Sensors provides you with an easy method for managing multiple devices offering an intuitive and user friendly Graphical User Interface that allows you to configure a PDU device and monitor power status of t...

Страница 37: ...ince this is the first time you are logging in use the default Username administrator and the default Password password For security purposes we recommend changing them to something unique see Changing the Administrator Login page 28 2 For remote methods of getting logged in to the network see IP Address Determination page 63 After you successfully log in the eco PDU Energy Connections page appear...

Страница 38: ...on To set up the network do the following 1 Click the Setup tab 2 The interface displays the Device Configuration page A screen similar to the one below appears 3 Fill in the IPv4 Configuration fields according to the information provided under IPv4 Configuration page 42 ...

Страница 39: ...eset the name and password fields to something unique then click Save at the bottom of the page Note If you forget the Administrator s name or password short the mainboard jumper to restore the default Administrator account See see Administrator Login Failure page 76 in the Appendix for full details Moving On After setting up the network and changing the default Administrator username and password...

Страница 40: ... You can get the IP address from the eco PDU administrator or see IP Address Determination page 63 for information about setting it up yourself 2 If a Security Alert dialog box appears accept the certificate it can be trusted The Login page appears 3 Provide a valid Username and Password set by the eco PDU administrator and select your language Options are English default Traditional Chinese Simpl...

Страница 41: ...u have successfully logged in the eco PDU Main Page comes up with the Outlet Access Connections page displayed Note The screen depicts an Administrator s page Depending on a user s type and permissions and your PE model not all of these elements appear ...

Страница 42: ... that pertain to the item selected in the tab bar The items that appear in the menu bar are determined by the user s type and the authorization options that were selected when the user s account was created 3 Sidebar The Sidebar provides a tree view listing of outlets that relate to the various tab bar and menu bar selections 4 Help Connects to on line help at the ATEN website for the device s con...

Страница 43: ... Manual 32 Energy Connections When you login to the eco PDU the interface opens on the Energy tab and the Connections menu The contents of the PDU Status and Bank Status sections are displayed in the main panel ...

Страница 44: ...falls below the minimum setting or exceeds the maximum setting an alarm is triggered Voltage Frequency is displayed here in Hz Power Factor displays a ratio between real and virtual power providing a power performance value based on external power sources i e not related to the eco PDU device Sensor 1 Sensor 2 If you have sensors installed in your installation use these fields to set the maximum m...

Страница 45: ... Settings These fields are used to set the maximum and minimum threshold settings for Current Voltage Power and Power Dissipation If a range falls below the minimum setting or exceeds the maximum setting an alarm is triggered Breaker status ON OFF displays here Power Factor displays a ratio between real and virtual power providing a power performance value based on external power sources i e not r...

Страница 46: ...istinctive name to all the banks PE5324T PE5342T only and outlets Click inside the field to input a name for a bank or outlet The maximum number of characters is 15 input only alphanumeric characters Space and Underscore Click Save located at the bottom right of the page to save the names ...

Страница 47: ...ports a total of 3 concurrent login sessions Administrator Information This section is used to set the Administrator name and password Only Administrators can view this section For details see Changing the Administrator Login page 28 SNMPv3 Account Information Enter values for Name Auth Password and Priv Password for SNMPv3 authentication if required SNMPv1 V2c Community Enter values Read communit...

Страница 48: ...elds in order to enable an account The various options are explained in the following table Field Description Management The Management field allows you to Enable or Disable a user s account Enable stores the user account Disable disables the user account Name From 1 to 16 characters are allowed depending on the Account Policy settings See Account Policy page 49 Password From 1 to 16 characters ar...

Страница 49: ...with the latest events The entry box to the right of the Refresh button lets you set the number of events to display per page Simply key in the number of your choice The top right of the main panel shows the total number of pages in the log file and what page you are currently viewing The buttons on the bottom row function as follows Clear click to erase the contents of the log event list First Pa...

Страница 50: ...ory item rows have a white background Click the checkboxes under the column headings to select which component s will receive notification of the log events Clicking on a main category heading s row automatically selects all the sub category items nested below it If you only want to set notification for some of the sub category events don t put a check in the main category row Instead drop down th...

Страница 51: ...PDU Name This field lets you give the device a unique name Simply delete whatever is in the text box and key in the name of your choice Click Save located at the bottom of the page to save the new name MAC Address This item displays the eco PDU s MAC address Firmware Version This item displays the current firmware version number You can reference it to see if there are newer versions available on ...

Страница 52: ... not be found Select whether to allow only secure browser logins as show below An explanation of the fields is given in the table below Note 1 Valid entries for all of the Service Ports are from 1 65535 2 The service ports cannot have the same value You must set a different value for each one 3 If there is no firewall on an Intranet for example it doesn t matter what these numbers are set to since...

Страница 53: ...S Server address automatically radio button To specify the DNS Server address manually select the Set DNS server address manually radio button and fill in the addresses for the Preferred and Alternate DNS servers with values appropriate for your network Note 1 If you choose Obtain IP address automatically when the device starts up it waits to get its IP address from the DHCP server If it hasn t ob...

Страница 54: ...n the IP address of your SMTP server 2 If your server requires authentication put a check in the My server requires authentication checkbox 3 Key in the appropriate account information in the Account Name Password and From fields Note Only one email address is allowed in the From fields and it cannot exceed 64 characters 4 Key in the email address addresses of where you want the event reports sent...

Страница 55: ... 3 Key in the IP address es and the service port number s of the computer s to be notified of SNMP trap events The valid port range is 1 65535 The default port number is 162 Note Make sure that the port number you specify here matches the port number used by the SNMP receiver computer 4 Key in the community value s if required for the SNMP version 5 Key in the auth privacy password s that correspo...

Страница 56: ...he events that take place on eco PDU devices and write them to the eco PDU Syslog server do the following 1 Check Enable Syslog Server 2 Key in the IP address and the port number of the Syslog server The valid port range is 1 65535 The default port number is 514 ...

Страница 57: ...e parameters Time Zone To establish the time zone that the eco PDU is located in drop down the Time Zone list and choose the city that most closely corresponds to where it is at If your country or region employs Daylight Saving Time Summer Time check the corresponding checkbox ...

Страница 58: ...te and time settings from the locally connected PC Network Time To have the time automatically synchronized to a network time server do the following 1 Check the Enable auto adjustment checkbox 2 Drop down the time server list to select your preferred time server or Check the Preferred custom server IP checkbox and key in the IP address of the time server of your choice 3 If you want to configure ...

Страница 59: ...st wait before attempting to login again after exceeding the number of allowed failures Working Mode If ICMP is enabled the eco PDU device can be pinged If it is not enabled the device cannot be pinged The default is Enabled Session Timeout If Web Session Timeout is enabled you can enter the number of minutes that can pass before the system forces a user to logout of the session When you have fini...

Страница 60: ...nimum Password Length Sets the minimum number of characters required for a password Acceptable values are from 1 16 Password Must Contain At Least Checking any of these items requires users to include at least one of the specified items in their password Note This policy does not affect existing user accounts Only new user accounts created after this policy has been enabled and users required to c...

Страница 61: ...126 abcdefg The following characters are allowed 0 9 a z A Z _ The following characters are not allowed Space Compound characters É Ç ñ etc Note 1 There must be a forward slash between the IP address and the string 2 If no login string is specified here anyone will be able to access the eco PDU device login page using the IP address alone This makes your installation less secure For security purpo...

Страница 62: ...s within the filter range are allowed access all other addresses are denied access If the exclude button is checked all the addresses within the filter range are denied access all other addresses are allowed access Adding Filters To add an IP filter do the following 1 Click Add A dialog box similar to the one below appears 2 Specify the start filter address in the dialog box for example 192 168 0 ...

Страница 63: ...P address is allowed by the IP filter but its MAC address is excluded by the MAC filter then that computer s access is blocked In other words if either filter blocks a computer then the computer is blocked no matter what the other filter is set to Modifying Filters To modify a filter select it in the IP Filter or MAC Filter list box and click Modify The Modify dialog box is similar to the Add dial...

Страница 64: ...te RADIUS servers The default port number for the Preferred server is 1812 the default port number for the Alternate server is 1645 Note Make sure that the port numbers you specify here match the port numbers used by the RADIUS servers 3 In the Timeout field set the time in seconds that the eco PDU device waits for a RADIUS server reply before it times out 4 In the Retries field set the number of ...

Страница 65: ... your own private encryption key and signed certificate rather than the default ATEN certificate There are two methods for establishing your private certificate generating a self signed certificate and importing a third party certificate authority CA signed certificate Generating a Self Signed Certificate If you wish to create your own self signed certificate a free utility openssl exe is availabl...

Страница 66: ...ted and select it 2 Click Browse to the right of Certificate browse to where your certificate file is located and select it 3 Click Upload to complete the procedure Note 1 Clicking Restore Default returns the device to using the default ATEN certificate 2 Both the private encryption key and the signed certificate must be imported at the same time When you have finished making your settings on this...

Страница 67: ...vel is compared with that of the upgrade file If the current version is equal to or higher than the upgrade version a popup message appears to inform you of the situation and stops the upgrade procedure Name Lists all of the eco PDU devices Click to put a check in the checkbox of the device s whose firmware you want to upgrade F W Version Displays the eco PDU s current firmware version Filename As...

Страница 68: ...orm you of the situation and stops the upgrade procedure If you didn t enable Check Main Firmware Version the upgrade file is installed without checking what its level is Once the upgrade completes successfully the switch resets itself 4 Log in again and check the firmware version to be sure it is the new one Firmware Upgrade Recovery Should the eco PDU s firmware upgrade procedure fail and the de...

Страница 69: ...what you want to do with the file select Save to disk then save it in a convenient location Restore To restore a previous backup do the following 1 Click Browse navigate to the file and select it Note If you renamed the file you can leave the new name There is no need to return it to its original name 2 In the Password field key in the same password that you used to save the file Note If you did n...

Страница 70: ...vided Never spill liquid of any kind on the device Unplug the device from the wall outlet before cleaning Do not use liquid or aerosol cleaners Use a damp cloth for cleaning The device should be operated from the type of power source indicated on the marking label If you are not sure of the type of power available consult your dealer or local power company To prevent damage to your installation it...

Страница 71: ...oints or short out parts resulting in a risk of fire or electrical shock Do not attempt to service the device yourself Refer all servicing to qualified service personnel If the following conditions occur unplug the device from the wall outlet and bring it to qualified service personnel for repair The power cord or plug has become damaged or frayed Liquid has been spilled into the device The device...

Страница 72: ... rack load should not exceed 80 percent of the branch circuit rating Make sure that all equipment used on the rack including power strips and other electrical connectors is properly grounded Ensure that proper airflow is provided to devices in the rack Ensure that the operating ambient temperature of the rack environment does not exceed the maximum ambient temperature specified for the equipment b...

Страница 73: ...forehand Product model number serial number and date of purchase Your computer configuration including operating system revision level expansion cards and software Any error messages displayed at the time the error occurred The sequence of operations that led up to the error Any other information you feel may be of help Email Support support aten usa com Online Technical Support Troubleshooting Do...

Страница 74: ...work address See Setup page 40 Method 1 For computers running Windows an IP address can be determined and or assigned with the IP Installer utility The utility can be obtained from the Download area of our web site or from the software CD Look under Driver SW and the model of your device After downloading the utility to your computer do the following 1 Unzip the contents of IPInstaller zip to a di...

Страница 75: ...Method 2 1 Set your computer s IP address to 192 168 0 XXX Where XXX represents any number or numbers except 60 192 168 0 60 is the default address of the eco PDU 2 Specify the device s default IP address 192 168 0 60 in your browser and you will be able to connect 3 Assign a fixed IP address for the device see IPv4 Configuration page 42 that is suitable for the network segment that it resides on ...

Страница 76: ...ment Orange Output Power Indicator 1 Red Power 1 Blue LAN 10 100M 1 Orange Green Link 1 Green Sensor 2 Green Switches Reset 1 x Semi recessed Pushbutton Button 1 x Pushbutton I P Rating 100 240V 50 60 Hz 16A Max Power Capacity 3680 VA Max O P Rating Per Port C13 15A Max 12A UL De rated C19 20A Max 16A UL De rated Total 20A Max 16A UL De rated Environment Operating Temperature 0 50oC Storage Temper...

Страница 77: ... Address 3 digit 7 segment Orange Output Power Indicator 1 Red Power 1 Blue LAN 10 100M 1 Orange Green Link 1 Green Sensor 2 Green Switches Reset 1 x Semi recessed Pushbutton Button 1 x Pushbutton I P Rating 100 240V 50 60 Hz 16A Max Power Capacity 3680 VA Max O P Rating Per Port C13 10A Max C19 16A Max Total 16A Max Environment Operating Temperature 0 40o C Storage Temperature 20 60o C Humidity 0...

Страница 78: ...nge Output Power Indicator 1 Red Power 1 Blue LAN 10 100M 1 Orange Green Link 1 Green Sensor 2 Green Switches Reset 1 x Semi recessed Pushbutton Button 1 x Pushbutton I P Rating 100 240V 50 60 Hz 16A Max Power Capacity 3680 VA Max O P Rating Per Port C13 15A Max 12A UL De rated C19 20A Max 16A UL De rated Total 20A Max 16A UL De rated Environment Operating Temperature 0 50o C Storage Temperature 2...

Страница 79: ...力 100 240 VAC 最大出力電流 ア ウ ト レ ッ ト 型番 B J のプ ラグの場合 C13 12A C19 16A 型番 G のプ ラグの場合 C13 10A C19 16A 最大出力電流 バ ン ク 16A 最大 最大出力電流 合 計 16A 最大 計測項目 バン ク レベルでの電流 電圧 VA PF お よび kWh 計測 電源切替操作 非対応 環境センサー用 ポー ト 数 2 計測精度 電圧 100VAC 250VAC 1 電力 100W Maximum Capacity 2 電流 0 1A 1A 0 1A 1A 20A 1 物理仕様 サイズ L x W x H 90 2 x 5 6 x 4 8 cm 重量 2 34 kg 電源ケーブル長 3 m 動作環境 温度 操作 保 管 型番 B J のプ ラグの場合 0 50 C 20 60 C 型番 G のプ ラグの場合 0 ...

Страница 80: ...Power 1 Blue LAN 10 100M 1 Orange Green Link 1 Green Sensor 2 Green Switches Reset 1 x Semi recessed Pushbutton Button 1 x Pushbutton I P Rating 100 120V 50 60 Hz 20A Max 16A UL de rated Power Capacity 2400 VA Max 1920 VA UL de rated O P Rating Per Port NEMA 5 20R 20A Max 16A UL de rated Per Bank 20A Max 16A UL de rated Total 20A Max 16A UL de rated Environment Operating Temperature 0 50o C Storag...

Страница 81: ... 20R x 12 バン ク 1 2 アウ ト レ ッ ト 番号 13 24 NEMA 5 20R x 12 出力定格電力 100 120 VAC 最大出力電流 ア ウ ト レ ッ ト NEMA 5 20R 16A 最大 最大出力電流 バ ン ク 16A 最大 最大出力電流 合 計 16A 最大 計測項目 バン ク レベルでの電流 電圧 VA PF お よび kWh 計測 電源切替操作 非対応 環境センサー用 ポー ト 数 2 計測精度 電圧 100VAC 250VAC 1 電力 100W Maximum Capacity 2 電流 0 1A 1A 0 1A 1A 20A 1 物理仕様 サイズ L x W x H 177 5 x 5 6 x 4 8 cm 重量 3 93 kg 電源ケーブル長 3 m 動作環境 温度 操作 保 管 0 50 C 20 60 C 湿度 操作および 保管 0 8...

Страница 82: ...ge Output Power Indicator 2 Red Power 1 Blue LAN 10 100M 1 Orange Green Link 1 Green Sensor 2 Green Switches Reset 1 x Semi recessed Pushbutton Power 2 x 16A Slim Breakers Button 1 x Pushbutton I P Rating 100 120V 50 60 Hz 30A Max 24A UL De rated Power Capacity 3600 VA Max O P Rating Per Port NEMA 5 20R 15A Max 12A UL De rated Per Bank 15A Max 12A UL De rated Total 30A Max 24A UL De rated Environm...

Страница 83: ...号 13 24 NEMA 5 20R 12 出力定格電力 100 120 VAC 最大出力電流 ア ウ ト レ ッ ト NEMA 5 20R 15A 最大 12A UL デ ィ レーテ ィ ング 最大出力電流 バ ン ク 15A 最大 12A UL デ ィ レーテ ィ ング 最大出力電流 合 計 30A 最大 12A UL デ ィ レーテ ィ ング ブレーカー 16A ス リムブレーカー 2 計測項目 バン ク レベルでの電流 電圧 VA PF お よび kWh 計測 電源切替操作 非対応 環境センサー用 ポー ト 数 2 計測精度 電圧 100VAC 250VAC 1 電力 100W Maximum Capacity 2 電流 0 1A 1A 0 1A 1A 20A 1 物理仕様 サイズ W D H 48 56 1775mm 重量 6 3 4 95 kg 電源ケーブル長 3m 動作環境 ...

Страница 84: ...ut Power Indicator 2 Red Power 1 Blue LAN 10 100M 1 Orange Green Link 1 Green Sensor 2 Green Switches Reset 1 x Semi recessed Pushbutton Power 2 x 16A Slim Breakers Button 1 x Pushbutton I P Rating 100 240V 50 60 Hz 30A Max 24A UL Power Capacity 6240 VA Max O P Rating Per Port C13 Duplex Receptacles 15A Max 12A UL De rated C19 15A Max 12A UL De rated Per Bank 15A Max 12A UL De rated Total 30A Max ...

Страница 85: ...EC320 C13 二重レセプ タ ク ル 18 IEC320 C19 3 出力定格電力 100 240 VAC 最大出力電流 ア ウ ト レ ッ ト IEC320 C13 二重レセプ タ クル 15A 最 大 12A UL デ ィ レーテ ィ ング IEC320 C19 15A 最大 12A UL デ ィ レーテ ィ ング 最大出力電流 バ ン ク 15A 最大 12A UL デ ィ レーテ ィ ング 最大出力電流 合 計 30A 最大 24A UL デ ィ レーテ ィ ング ブレーカー 16A ス リムブレーカー 2 計測項目 バン ク レベルでの電流 電圧 VA PF お よび kWh 計測 電源切替操作 非対応 環境センサー用 ポー ト 数 2 計測精度 電圧 100VAC 250VAC 1 電力 100W 最大容量 2 電流 0 1A 1A 0 1A 1A 20A 1 物理仕様 ...

Страница 86: ...Address 3 digit 7 segment Orange Output Power Indicator 2 Red Power 1 Blue LAN 10 100M 1 Orange Green Link 1 Green Sensor 2 Green Switches Reset 1 x Semi recessed Pushbutton Power 2 x 16A Slim Breakers Button 1 x Pushbutton I P Rating 100 240V 50 60Hz 32A Max Power Capacity 7360 VA Max O P Rating Per Port C13 Duplex Receptacles 10A Max C19 16A Max Per Bank 16 Max Total 32A Max Environment Operatin...

Страница 87: ...le you can clear the login information with the following procedure 1 Power off the eco PDU and remove its housing 2 Short the jumper labeled J2 PIN1 and PIN2 3 Power on the eco PDU 4 After the beep indicates successfully powered on power off the switch 5 Remove the jumper cap from J2 6 Close the housing and start the eco PDU After you start you can use the default Username and Password to log in ...

Страница 88: ...o improper equipment or attempted repair by anyone other than ATEN This warranty does not cover products sold AS IS or WITH FAULTS IN NO EVENT SHALL ATEN S LIABILITY EXCEED THE PRICE PAID FOR THE PRODUCT FURTHER ATEN SHALL NOT BE RESPONSIBLE FOR DIRECT INDIRECT SPECIAL INCIDENTAL OR CONSEQUENTIAL DAMAGES RESULTING FROM THE USE OF THE PRODUCT ITS ACCOMPANYING SOFTWARE OR ITS DOCUMENTATION ATEN SHAL...

Отзывы: