
Appendix
235
2. Attach the left and right
easy-installation
mounting rails to the inside of
the rack. The flange that supports the switch will be to the inside.
a) Screw the front flanges to the rack first.
b) Slide the bars with the rear flanges toward the rack until the flanges
make contact with the rack, then screw the rear flanges to the rack.
(Continues on next page.)
Support
Flange
Rear Flange
Slide Bar
Rear Attachment
Sliding Bracket
Rear Flange
LEFT
RAIL
RIGHT
RAIL
Содержание 4719264645624
Страница 1: ...LCD KVM over IP Switch CL5708I CL5716I User Manual www aten com ...
Страница 28: ...CL5708I CL5716I User Manual 12 This Page Intentionally Left Blank ...
Страница 33: ...Chapter 2 Hardware Setup 17 Installation Diagram 1 5 2 4 7 3 6 ...
Страница 46: ...CL5708I CL5716I User Manual 30 This Page Intentionally Left Blank ...
Страница 60: ...CL5708I CL5716I User Manual 44 This Page Intentionally Left Blank ...
Страница 80: ...CL5708I CL5716I User Manual 64 This Page Intentionally Left Blank ...
Страница 170: ...CL5708I CL5716I User Manual 154 This Page Intentionally Left Blank ...
Страница 174: ...CL5708I CL5716I User Manual 158 This Page Intentionally Left Blank ...
Страница 182: ...CL5708I CL5716I User Manual 166 This Page Intentionally Left Blank ...
Страница 202: ...CL5708I CL5716I User Manual 186 This Page Intentionally Left Blank ...