
4
All information, documentation and specifications contained in this media are subject to change without prior notification by the manufacturer.
Please visit our website to find the most up-to-date version.
Hardware Installation – 2X-040G
Since installation for 2X-040G mounting kit and the corresponding LCD KVM switches / LCD consoles are the same,
one combination will be used as the example instructions below.
1.
Attach the left and right L-shaped brackets to the back of the rack, installing four screws in the tabs to secure
them in place.
2.
While one person inserts the unit into place by sliding its left and right side bars into the left and right L-shaped
brackets (on the rack), have a second person screw the front brackets to the rack.
3.
After the front brackets are secured, tighten all the screws.
Allow at least 5.1 cm on each side for proper ventilation, and at least 12.7 cm at the back for the power cord
and cable clearance.