10.3- CONVEYOR INSTALLATION
The conveyors are adjusted as right and left so that the meter parts are at the back and at the same time, from two of the bolts that hold the
clamp pin, only one screw, without removing the ferrule (148) (As shown at the picture below) will be taken out and it will be fastened so that it
fits on the conveyor ferrules.
(Pic.1-4)
At this stage, ferrule no 20 and bolt number 21 that come with the machine will be firmly screwed to the hole detached. The other bolt not dismantled shall be also
dismantled and the same procedure shall be applied for this bolt. The bolts that we remove have to be saved to be used during the dismantling of the conveyors.
The same procedure must be followed on the other conveyor, too.
(Pic.2-4)
Содержание CRM 250S
Страница 2: ...2 DIMENSIONS FIGURE 1 PARTS LIST FIGURE 2 RESİM FIGURE РИСУНОК 1 ...
Страница 3: ...3 FIGURE 4 FIGURE 3 ...
Страница 4: ...4 FIGURE 5 ...
Страница 19: ...19 ELECTRIC PNEUMATIC DİAGRAM ...
Страница 20: ...20 CRM250 1P ELECTRICAL DIAGRAM SHEET 1 CRM250 1P ELECTRICAL DIAGRAM SHEET 2 ...
Страница 21: ...21 CRM250 1P ELECTRICAL DIAGRAM SHEET 3 CRM250 1P PNEUMATIC DIAGRAM ...