ATECH CRM 250S Скачать руководство пользователя страница 1

TECHNICAL FEATURES 

kg 

kg 

CRM 
250S 

230V 1P 

200 Hz 

1100W*3

6-8 BAR

10 

Lt/dak. 
Lt/min. 

12000 

dev/dak 

RPM 

x1,x2 = 

650,350 mm

 

y1,y2 = 

180,230 mm

 

z1,z2= 

170,150 mm

 

W

 = 110 

L

 = 110 

H

 = 180 

370 

380 

MODEL TYPE

MODEL

SERIAL NO

SERI NO

PROD.DATE

ÜRETİM TAR

.

TOTAL POWER

RATED VOLTAGE

NOMİNAL GERİLİM

230V AC 1P  NPE

RATED CURRENT

NOMINAL AKIM

WEIGHT

AIR PRESSURE

 

AIR CONSUMP.

  10A

  380KG.

6-8 BAR

 

 10 Lt/min

IDLING REV.

 

DEVİR SAYISI

12000 x3 
  RPM

CRM 250S

Содержание CRM 250S

Страница 1: ... 350 mm y1 y2 180 230 mm z1 z2 170 150 mm W 110 L 110 H 180 370 380 MODEL TYPE MODEL SERIAL NO SERI NO PROD DATE ÜRETİM TAR TOTAL POWER RATED VOLTAGE NOMİNAL GERİLİM 230V AC 1P NPE RATED CURRENT NOMINAL AKIM WEIGHT AIR PRESSURE AIR CONSUMP 10A 380KG 6 8 BAR 10 Lt min IDLING REV DEVİR SAYISI 12000 x3 RPM CRM 250S ...

Страница 2: ...2 DIMENSIONS FIGURE 1 PARTS LIST FIGURE 2 RESİM FIGURE РИСУНОК 1 ...

Страница 3: ...3 FIGURE 4 FIGURE 3 ...

Страница 4: ...4 FIGURE 5 ...

Страница 5: ...IGHT SUPPORT MOUNTING 5 3UA810030 0011 KN 152 SUPPORT SEMI COMPLETE 6 3UA280030 0011 CLAMP MOUNTING 7 3UA040030 0008 8 3UA040030 0007 2 PIPE HANDLE 3 M8 32 8 3UA040030 0002 PIPE HANDLE 1 M10 50 9 2TU011441 0975 SPRAY MIST CONNECTION PLATE 10 2TU012210 1258 FIXING PLATE 11 2TU012610 0044 CLAMP PISTON CONNECTION 12 2TU011210 1007 TRACER PIN 13 2TU011110 1345 JOYSTICK FIXING BOLT 14 1PN010000 0012 SP...

Страница 6: ... Ø5 0 L100 SINGLE HEAD 19 1YY030000 0016 TOP HEAD GAS SPRING 1 20 1YY030000 0017 BOTTOM HEAD GAS SPRING 2 21 1YY030000 0015 FRONT GAS SPRING 3 22 1YY030000 0014 REAR GAS SPRING 3 23 1SR020000 0007 BALL JOINT 24 1SR020000 0006 ROD EYE 25 2TU013210 0205 BACK GAUGE 26 2TU013210 0211 UPPER CLAMP PAD 27 1PL010000 0033 FRONT CLAMP TIP ...

Страница 7: ... Machine 5 Installation of the Machine 5 1 Preparation 5 2 Connecting to Power Source 6 Machine s Safety Information 7 Operation 7 1 Preparation 7 2 Operation 8 Maintenance Service and Repair 8 1 Maintenance 8 2 Changing the cutting tool 8 3 Adjust the air pressure pneumatic systems 9 Warranty conditions 10 Mounting Manual 10 1 Installation of the Dampers 10 2 Installation of the Motion Lever 10 3...

Страница 8: ...Technical labels with the model description of the machine are fixed onto the front side of each machine The machine s serial number and manufacturing year are stipulated on the technical label Average life usage of production is 10 years If you have any further failure and complaint please inform to our below mentioned technical service by verbal or written AUTHORIZED DISTRIBUTOR Atech Machine In...

Страница 9: ... accident risks to train them on prevention of accidents to provide for necessary safety equipment and devices for the operator s safety 2 2 4 Machine should be operated only by staff members who have read and understood the contents of this manual 2 2 5 All directives recommendations and general safety rules contained in this manual have to be observed fully The machine cannot be operated in any ...

Страница 10: ...r or dealer 2 3 14 Don t use machines with improper functioning buttons and switches 2 3 15 Don t keep flammable combustive liquids and materials next to the machine and electric connections 3 MACHINE S DESCRIPTION Copy router machines designed to open lock handle hinge and window fastening slots onto PVC and Aluminum profiles Channels in different dimensions can be opened independently from copyi...

Страница 11: ...accordance with the data on the machine s label 5 2 5 After electrical connection is made machine must be operated in idle running and it must be controlled whether rotation directions of cutting tools are correct or not and if the rotation direction is wrong appropriate connection must be made 6 MACHINE S SAFETY INFORMATION 6 1 Lifting installation electric maintenance of the machine should be ca...

Страница 12: ...PICTURE 6 No 96 108 and 97 The control of the pneumatic clamps can be operated with the button on which the figure of clamp can be seen on the control panel PICTURE 2 No 1PN010000 0054 7 2 3 Choose from the patterns that are on the machine such as PICTURE 7 lock handle hinge slot etc Place the tracer pin PICTURE 7 No 42 inside the hole automatically in which process will be done by rotating the re...

Страница 13: ...rea It goes up through dampers If you see any abnormality in this movement do not start the machine 7 2 14 While the upper motor works or while material is loaded the forward backward move of the lower motors is put to middle position through the dampers to prevent crashes Always check the positions of the dampers and be careful for the possibility of collision of the milling cutter tips 7 2 15 Wh...

Страница 14: ...tic components At the end of the working day empty the accumulated water by opening water discharge valve under the collection container 8 3 4 In order to put oil to the oil tank remove the reservoir by turning Oils recommended by the manufacturer are TELLUS C10 BP ENERGOL HLP 10 MOBIL DTE LIGHT PETROL OFİSİ SPINDURA 10 9 WARRANTY CONDITIONS ATech Machine Inc guarantees that all machines have been...

Страница 15: ...warranty does not cover in any case damages caused by the malfunction of the Machine 10 Mounting Manual 10 1 Installation of the Dampers A Horizontal Platform Damper Installation A 1 Loosen the clamp lever on the platform Picture 1 1 pull the platform toward one self through the control lever Picture 2 1 Pic 1 1 Pic 2 1 Pic 2 1 A 2 The damper that comes with the machine shall be screwed to its pla...

Страница 16: ...rough the black color arm pull the head up picture 2 2 Pic 1 2 Pic 2 2 B 2 Without changing this position the ferrule thin ferrule and screw shall be detached picture 3 2 and it will be prepared First the thick ferrule shall be placed between the damper and profile as seen on the picture Picture 4 2 here attention must be paid that the holes must overlap Pic 3 2 ...

Страница 17: ...er and after the thin ferrule will be put on the screw and the installation is finished with the bolt screwed 10 2 Motion Lever Installation piece no 111 While the Lever 111 is demounted it will be passed through the rod eye 123 of the machine and then will be screwed with a bolt to the ball joint 113 Pic 1 3 ...

Страница 18: ...cturebelow willbetakenoutanditwillbefastenedsothatit fitsontheconveyorferrules Pic 1 4 Atthisstage ferruleno20andboltnumber21thatcomewiththemachinewillbefirmlyscrewedtotheholedetached Theotherboltnotdismantledshallbealso dismantledandthesameprocedureshallbeappliedforthisbolt Theboltsthatweremovehavetobesavedtobeusedduringthedismantlingoftheconveyors Thesameproceduremustbefollowedontheotherconveyor...

Страница 19: ...19 ELECTRIC PNEUMATIC DİAGRAM ...

Страница 20: ...20 CRM250 1P ELECTRICAL DIAGRAM SHEET 1 CRM250 1P ELECTRICAL DIAGRAM SHEET 2 ...

Страница 21: ...21 CRM250 1P ELECTRICAL DIAGRAM SHEET 3 CRM250 1P PNEUMATIC DIAGRAM ...

Отзывы: