CHAPTER 3. EQUIPMENT ROOM
DESIGN
General
Hardware Equipment Room Applications
Trunk/Auxiliary Field
Trunk/Auxiliary Field (110-Type Hardware Only)
Distribution Field
Distribution Field (110-Type Hardware Only)
Distribution Field (66-Type Hardware Only)
Typical System Equipment Room Floor Plans
General
Typical Floor Plans
Typical Cross-Connect Field Using 110-Type Hardware
Typical Cross-Connect Field Using 66-Type Hardware
Wall Space Requirements
Wall Space Requirements for 66-Type Hardware
Equipment Requirements
Cable Slack Manager Requirements
110-Type Hardware and Patch Cord Requirements
66-Type Hardware Requirements
Equipment Room Hardware And Cabling
Installation
Hardware Installation
Installing the Cross-Connect Field
Wall Mounting 110A-Type Terminal Blocks
Wall Mounting 110P-Type Terminal Blocks
Frame Mounting 110P-Type Terminal Blocks
Wall Mounting 66-Type Connecting Blocks
Installing Cable Slack Managers
Labeling the Cross-Connect Field
Labeling 110-Type Terminal Blocks
Labeling 66-Type Connecting Blocks
Installing Sneak Fuse Panels
Cable Installation
Labels
Routing Cable Guidelines
Installing Control Carrier Outputs Cable
3-1
3-1
3-1
3-2
3-4
3-5
3-11
3-13
3-13
3-13
3-16
3-20
3-20
3-21
3-21
3-21
3-22
3-24
3-25
3-25
3-25
3-25
3-25
3-28
3-30
3-32
3-32
3-32
3-58
3-63
3-64
3-64
3-66
3-75
-i-
Содержание System 75
Страница 1: ...AT T AT T System 75 and System 75 XE Wiring...
Страница 2: ...AT T AT T System 75 and System 75 XE Wiring 555 200 111 Issue 2 August 1989...
Страница 16: ...System Wiring Figure 1 2 System Uniform Wiring Plan 1 7...
Страница 17: ...CHAPTER 1 INTRODUCTION Figure 1 3 Sample Uniform Wiring Installation 1 8...
Страница 29: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 1 Block Diagram of System 75 or 75 XE Installation 2 2...
Страница 35: ...CHAPTER 2 HARDWARE 66 110 Type Figure 2 4 110A Type 100 Pair Terminal Block 2 8...
Страница 36: ...110 Type Hardware Description Figure 2 5 110A Type 300 Pair Terminal Block 2 9...
Страница 98: ...Typical System Equipment Room Floor Plans 3 15...
Страница 143: ...CHAPTER 3 EQUIPMENT ROOM DESIGN 3 60...
Страница 144: ...Equipment Room Hardware And Cabling Installation 3 61...
Страница 162: ...Equipment Room Hardware And Cabling Installation 3 79...
Страница 163: ...Equipment Room Hardware And Cabling Installation 3 80...
Страница 197: ...Tables Table 4 A Recommended Protectors 4 42 v...
Страница 203: ...CHAPTER 4 STATION WIRING Figure 4 4 3 Pair to 4 Pair Wiring Labeling From Equipment Room to Information Outlet 4 6...
Страница 205: ...CHAPTER 4 STATION WIRING Figure 4 5 4 Pair Station Wiring Labeling From Equipment Room to Information Outlet 4 8...
Страница 212: ...Adjunct Powering 4 15...
Страница 214: ...Adjunct Powering 4 17...
Страница 216: ...Patch Cord Jumper Installation And Administration 4 19...
Страница 241: ...CHAPTER 4 STATION WIRING 4 44...
Страница 244: ...Miscellaneous Wiring Installation 4 47...
Страница 246: ...Miscellaneous Wiring Installation 4 49...
Страница 252: ...Miscellaneous Wiring Installation 4 55...
Страница 254: ...Miscellaneous Wiring Installation 4 57...
Страница 277: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION Figure 5 1 Connections for Loudspeaker Paging and Music on Hold 5 4...
Страница 314: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 41...
Страница 324: ...CHAPTER 5 AUXILIARY EQUIPMENT INSTALLATION 5 51...