DCP Board Configuration and Installation
(System 75)
Your system may be shipped with the DCP board installed. If you need to
add the DCP board to the system, follow these steps:
1
Check the jumpers on the DCP board. The jumpers should be set as
FIGURE 2-33 Location of Jumpers on DCP Board
Phone
Line
Other
2
Carefully insert the board in its proper location. The board goes into
the leftmost available slot (after the IVP boards) on desktop
configurations and into the rearmost available slot (after the IVP boards)
on floor models.
Hardware Installation
2-43
Содержание 6386 WGS
Страница 1: ...AT T 999 500 355 Issue 1 July 1990 AUDIX Voice Power Installation and Maintenance Guide...
Страница 14: ......
Страница 37: ...FIGURE 2 19 Location of Memory SIMM Sockets on 6386 25 WGS Hardware Installation 2 23...
Страница 54: ...FIGURE 2 30 VDC600 Switch and Jumper Locations and Settings 2 40 Hardware Installation and Maintenance...
Страница 61: ...FIGURE 2 38 6386E 33 WGS System Module Back Panel Hardware Installation 2 47...
Страница 112: ......
Страница 124: ......
Страница 134: ......
Страница 205: ......
Страница 209: ......