background image

 A

TAG 

A-Serie

16

The Benchmark Scheme

ATAG  Heating  UK  Ltd  is  a  licensed  member  of 

the Benchmark Scheme which aims to improve 

the standards of installation and commissioning 

of domestic heating and hot water systems in the 

UK and to encourage regular servicing to optimise 

safety, efficiency and performance.

Benchmark  is  managed  and  promoted  by  the 

Heating and Hotwater Industry Council. For more 

information visit www.centralheating.co.uk

Please ensure that the installer has fully comple-

ted the Benchmark Checklist on the inside back 

pages of the installation instructions supplied with 

the product and that you have signed it to say that 

you have received a full and clear explanation of 

its  operation. The  installer  is  legally  required  to 

complete a commissioning checklist as a means 

of complying with the appropriate Building Regu-

lations (England and Wales).

All  installations  must  be  notified  to  Local  Area 

Building Control either directly or through a Com-

petent Persons Scheme. A Building Regulations 

Compliance Certificate will then be issued to the 

customer who should, on receipt, write the Notifi-

cation Number on the Benchmark Checklist.

This product should be serviced regularly to opti-

mise its safety, efficiency and performance. The 

service  engineer  should  complete  the  relevant 

Service Record on the Benchmark Checklist after 

each service.

The Benchmark Checklist may be required in the 

event  of  any  warranty  work  and  as  supporting 

documentation  relating  to  home  improvements 

in  the  optional  documents  section  of  the  Home 

Information Pack.“

Содержание A200S

Страница 1: ...U s e r m a n u a l A200S A203C A320S A325C A325EC...

Страница 2: ...perature 20 4 4 Requesting current data 20 5 Filling the installation 21 6 Decommissioning the boiler 22 7 Comfort Eco setting of hot water 23 8 Pump continuously 24 9 Errors 25 10 Maintenance 25 11 W...

Страница 3: ...y before operating the boiler In case of doubt or errors contact your installer ATAG Heating reserves the right to change the specifications and dimensions without prior notice Work on the boiler must...

Страница 4: ...explanation of its operation The installer is legally required to complete a commissioning checklist as a means of complying with the appropriate Building Regu lations England and Wales All installat...

Страница 5: ...once you are outside the building Corrosion protection Do not use sprays chlorine containing cleaning products solvents paints etc in the vicinity of the device or its air supply These substances have...

Страница 6: ...e European standard CE Adeclaration of conformity can be obtained from the manufacturer The efficiency of the boiler is very high and the radiation convection and standby losses very low The emission...

Страница 7: ...ter a malfunction has occurred In case of a failure the symbol is displayed with a Cx xx code In other cases the Reset button has no function and will not respond when operated See 9 for a brief overv...

Страница 8: ...directly Heating program OFF Press until the lowest value is reached and then press again The display is showing and the upper is off Switching on works in reverse order i i R i i R i i R Briefly pres...

Страница 9: ...program of approx 7 min becomes active 9 Bleed the entire CH installation start at the lowest point 10 Check the water pressure and if necessary top off until 1 5 to 1 7 bar 11 Make sure the cold wate...

Страница 10: ...d The arrow to the left is off In case of work on the heating installation Make sure no heat request occurs let no hot water tap run and set the room thermostat to low Pull the plug from the wall sock...

Страница 11: ...OK key for 3 seconds The display is showing P6 alternated with 81 Press the Scroll key 1x The display is showing P6 alternated with 84 Press the OK key The display is showing b0 Press the Scroll key 1...

Страница 12: ...K key The display is showing off automatic Adjust the value by means of the or key to on continuously Briefly press the OK key to confirm the new setting The display is showing the chosen parameter ag...

Страница 13: ...ram active approx 7 min c1 17 water pressure too high c1 18 water pressure too low If leaks occur in the installation please contact your installer Venting program active Conclude a maintenance agreem...

Страница 14: ...www atagheating com...

Отзывы: