2-7
ASUS RS100-E9-PI2
5.
Close the load plate (A), ensuring that
the front edge of the load plate slides
under the retention lock (B) then push
down the load lever (C).
6.
Insert the load lever under the retention
tab to remove the PnP cap from the
CPU socket.
7.
Apply some Thermal Interface Material
to the exposed area of the CPU that
the heatsink will come in contact with,
ensuring that it is evenly spread in a thin
layer.
Skip this step if the heatsink comes
with pre-applied Thermal Interface
Material.
The Thermal Interface Material is
toxic and inedible. DO NOT eat it. If
it gets into your eyes or touches your
skin, wash it off immediately and seek
professional medical help.
Retention
lock
Load lever
Retention tab
Load lever
Содержание RS100-E9-P12
Страница 1: ...1U Rackmount Server User Guide RS100 E9 PI2 ...
Страница 10: ...x ...
Страница 60: ...Chapter 3 Installation Options 3 6 ...
Страница 64: ...4 4 Chapter 4 Motherboard Information 4 2 3 Motherboard layout ...
Страница 103: ...ASUS RS100 E9 PI2 5 17 Intel Server Platform Services Intel TXT Information ...
Страница 134: ...5 48 Chapter 5 BIOS Setup ...
Страница 152: ...6 18 Chapter 6 RAID Configuration ...
Страница 167: ...A 1 ASUS RS100 E9 PI2 A Appendix Appendix ...
Страница 168: ...A 2 Appendix P10S M DC block diagram ...
Страница 174: ...A 8 Appendix ...