background image

4.

It is suggested to choose an installation 
place where nothing can disturb the 
function of the FireBag thermal safety 
device.

5.

Use the correct wrench when installing.

6.

Check the tightness of the valve and its 
connection after installation.

7.

When installed, do not paint or cover 
the safety device.

Caution:

Make sure the materials of

the plant and its related connections 
can handle the specified thermal 
load before installing the safety device
to guarantee proper functioning.

5. MAINTENANCE

The FireBag does not need maintenance. 
A complete valve (or complete connection)
is to be replaced whenever the thermal
safety device goes off.

6. CERTIFICATIONS

• AGA ANSI Z21.15-CGA 9.1-M97 

(certain models)

• CGA ANSI Z21.15-CGA 9.1-M97 

(certain models)

• DIN 3586 thermo activated safety 

device for gas applications

• European UNI EN 1775 Standard for 

indoor gas installations

• European Directive 90/396/CEE 

certification for durability in mechanical 
or thermal stress

• German DVGW TRGI 86/96 Standard 

for thermo activated locking systems on 
gas heaters, water heaters & domestic 
gas fittings

• German Standard Muster-

Feuerverordnung (FeuVo v. 02/95 - 
edition 09/97) for thermo activated 
devices

• Italian UNI 7129 Ed 2001 Standard for 

fire protection and gas supply line 
components

Assured Automation declines any
responsibility for faulty usage or 
false interpretation of the above
installation directions. 

FireBag thermal 

safety device

Flow

3.

Installation position can be freely 
chosen, but look carefully at gas flow 
direction (as indicated by the arrow on 
the valve body).

Flow Diagram

Отзывы: