background image

INSTALLATION

2/4

INSIDE THE LUMINAIRE

Si-3

6

LED test switch

CAUTION: MAKE CERTAIN THE AC POWER IS OFF AND THE Si-36 UNIT CONNECTOR IS 
                    DISCONNECTED UNTIL THE INSTALLATION IS COMPLETE.

Output 

Output Power

 Voltage

0°C≤Ta≤55°C

Model

Input 

230V/50Hz

Si-36

 120V/60Hz

277V/60Hz

10°C≤Ta≤55°C

230V/50Hz

120V/60Hz

277V/60Hz

Max. 36W

With dimmable or 
non-dimmable load 

Max. 27W

Max. non-dimmable load 

1.  OPERATING SPECIFICATIONS

  

2.  INSTALLING THE Si-36

       The Si-36 can be mounted inside or outside (nearby or on top of) the luminaire. 

  

3.  INSTALLING THE LED TEST SWITCH (LTS)

       Select a convenient location for the LED test switch so that it can be seen after installation. 
       Drill a 1/2"(12 mm) hole for mounting the LED test switch. Connect the wires from the LED 
       test switch to the Si-36 according to the wiring diagram on page 3. 

OUTSIDE THE LUMINAIRE

Si-3

6

One 7/8" (22mm) hole for 
conduit connector for Si-36

Typical length

1"

1/4"

10"

T<0.20"

All dimensions are typical

www

.

AssuranceLighting.com

(MOUNT ING HOLE) Ø1/2"

PUSH TO TEST

Содержание Emergency Lighting Si-36

Страница 1: ...perating time over 90 minutes the output emergency power of Si 36 should be Max 36W with auto adjust for 0 10V dimming installations and operating temperatures between 10 C Ta 55 C The Max load for non dimmed loads must be limited to 36W at operating temperatures range of 10 C Ta 55 C and 27W between 0 C Ta 55 C Contact Factory for details regarding 2 hour run time applications 7 This product is s...

Страница 2: ...G SPECIFICATIONS 2 INSTALLING THE Si 36 The Si 36 can be mounted inside or outside nearby or on top of the luminaire 3 INSTALLING THE LED TEST SWITCH LTS Select a convenient location for the LED test switch so that it can be seen after installation Drill a 1 2 12 mm hole for mounting the LED test switch Connect the wires from the LED test switch to the Si 36 according to the wiring diagram on page...

Страница 3: ...er to the wiring diagrams below Make connections in the following order 1 2 3 4 5 6 7 3 Consult the factory for other wiring diagrams www AssuranceLighting com ANY QUANTITY 0 10 VDC NORMAL 3 VDC STANDARD 2 VDC ALTERNATE EMERGENCY OPERATION Si 36 YELLOW BLACK GREEN YELLOW WHITE NEUTRAL GROUND HOT LED Test Switch 120 277V AC LED FLUORESCENT LUMINAIRE RED RED WHITE RED RED WHITE DIM IN VIOLET DIM IN ...

Страница 4: ...ously within 5 seconds to force a 30 second monthly test After the test is complete the next 30 day monthly test will count from this date 2 Press the LTS 3 times continuously within 5 seconds to force a 90 minute annual test After the test is completed the next 52 week annual test will count from this date 3 During any manual test press and hold the LTS for greater than 3 seconds to terminate a m...

Отзывы: