FM6100 Series Multi-Point Lock
6
www.sargentlock.com • A8058:A
4/16/10
Copyright
©
2010,
Sargen
t
Manufacturing
Company
,an
A
S
S
A
AB
LO
Y
G
roup
company
.All
right
s
reser
ved
.
Reproduction
in
whole
or
in
par
t
without
the
express
writ
ten
permission
of
Sargen
t
Manufacturing
Company
is
prohibited
.
Before continuing to the next step be certain the top pusher
and bottom bolt are in the correct position.
• Bottom Bolt should be flush to the bottom of
the shutter.
• The lifting platform (item 1) should be moved down the bottom
rod and placed against the shelf of the lifting platform jig.
• Next secure the platforms position by tightening the cone
point set screw (item 2). This will assure the point on the set
screw embeds itself firmly into the bottom rod.
Alignment of components in preparation for drilling and pinning
continued
4
FOR
TRAINING
PURPOSES
ONLY
Содержание Sargent FM6100 Series
Страница 11: ...F O R T R A I N I N G P U R P O S E S O N L Y...