![Assa Abloy Norton 1600 Series Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/assa-abloy/norton-1600-series/norton-1600-series_quick-start-manual_2988645004.webp)
Copyright © 2016, 2020, ASSA ABLOY Accessories and Door Controls Group, Inc. All rights reserved. Reproduction in whole
or in part without the express written permission of ASSA ABLOY Accessories and Door Controls Group, Inc. is prohibited.
80-9316-2535-020 Rev 3 04/20
4
90°
1600SS Top Jamb Mount Installation
(Right Hand Shown)
2. Mount closer to frame.
Opening
To 100°
101° to 120°
*
121° to 180°
7-1/2
(191)
6
(152)
3-1/2
(89)
Dimension "A"
*
Door/Wall/Hardware/Jamb
conditions permitting
9-1/16
(230)
3/4
(19)
1/2
(13)
6
(152)
1-1/2
(38)
1-3/4
(44)
CL
A
Top of
Door
x4
4b. Install separate arms.
You’ve now installed the
1600SS Non Hold Open Closer - Top Jamb Mount.
🛑
Go to page 2 for closer adjustments and decorative cap or cover installation.
RH and LH:
Position flat at S
1. Prepare door and frame.
4a. Choose arm placement
in shoe.
or
or
7-1/2%
Stronger
+
7-1/2%
Weaker
-
1st
2nd
A
A
YY
S S
Z Z
BB
x2
BB
A
A
3. Take arms apart at elbow.
Spring Power
Preload
Position
Connecting
arms at proper
preload position
may take several
attempts.
5. Connect arms and adjust connecting rod length to
set arm elbow 90° to door.