Assa Abloy Corbin Russwin ED2400 Series Скачать руководство пользователя страница 12

12

Installation Instructions

Exit Devices

FM572 10/22

Copyright © 2022, ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved. Reproduction in whole or in part 
without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited.

For installation assistance contact Corbin Russwin

1-800-543-3658 • [email protected]

ED2400 & ED2400(A) Series Surface Vertical Rod

4

 

Installation,  continued

c

Prepare Rods

Figure 13

Figure 14

 

 

 

Jig

Dia. Thru

1/8"

(3.20 mm)

3/8"

(10 mm)

Rod 

(Typical pin end)

Bolt

Bottom 
Rod

1/8" x 1/2" Rollpin

Bottom Rod 
Connector

32-1/4"

(818 mm)

3-3/4"

(95 mm)

Adjustment left:
1/2" (13 mm) in-out.

PRESS FLUSH

To Lenghten Rods (Figure 13)

•  Use Rod Extension(s) to extend Rod to length needed or 

longer (2”, 6”, 12”, or 24” Rod Extensions available).

•  Cut excess length from end of rod with pin hole.
•  Apply screw locking compound (available at automotive parts 

store) to Rod Extension(s) male threads. Thread Extension(s) 
until seated tight over Rod.

To Cut Rods (Figure 14)

•  Cut from the end with pin hole. NEVER CUT THREADED END.
•  Press Jig until it bottoms over Rod.
•  Drill 1/8” (3 mm) dia. hole thru, 3/8” (10 mm) from end of 

Rod.

Bottom Rods (Figure 18)

•  Ready for 39-15/16” (1014 mm) Floor to device center.

To Lower Device

•  Bottom Rod cutoff length is distance that device was lowered 

below 39-15/16” (1014 mm).

•  Add to top rod a length equal to the bottom rod cut.

Example:

Device at 36” (914 mm) from floor
39-15/16” - 36” = 3-15/16” (100 mm)
The top rod must be lengthened 3-15/16” (100 mm)

Содержание Corbin Russwin ED2400 Series

Страница 1: ...cess and Egress Hardware Group Inc is prohibited For installation assistance contact Corbin Russwin 1 800 543 3658 techsupport corbinrusswin assaabloy com WARNING This product can expose you to lead w...

Страница 2: ...t corbinrusswin assaabloy com ED2400 ED2400 A Series Surface Vertical Rod TOC Table of Contents 1 Strikes 3 2 General Information 4 a Change Hands 5 b 1 4 20 Sex Nut Option 5 c Rod Extention Options 5...

Страница 3: ...ms each 1 16 thick and one locking plate 797 Optional bracket for mounting 650F54 top strike in flush transom opening Supplied with 1 4 20 machine screws SN 134 sex nuts optional 1 3 4 44mm 2 1 2 64mm...

Страница 4: ...8 PRH AB SMS Guide cover Top rod Roll pin Top rod connector 1 10 24 x 1 2 PPH F TCS End cap top 2 1 4 20 x 3 4 PRHMS Special Head End cap bottom Bar Assembly Center case Rod extension Assy Dogging Ke...

Страница 5: ...l Information continued Lift block Vertical lifter assembly 4 8 32 x 3 16 PRHMS Vertical lifter assembly 4 8 32 x 3 16 PRHMS RHR Device LHR Device Remove four 4 screws and vertical lifter assembly Rot...

Страница 6: ...nt This is particularly required in corrosive environments for proper product function 2 Check mounting fasteners periodically Retighten if found loose Apply screw locking compound available at automo...

Страница 7: ...st not bind Door must not sag Minimum Door Stile 4 1 2 114 mm Door and frame must meet structural and dimensional specifications on exit device template s for door and frame preparation Reinforcement...

Страница 8: ...l and vertical centerlines as shown Figure 6 LHR door shown Preparation is typical for both door hands Caution If device is mounted higher or lower than shown rod length must change Lengthen or cut to...

Страница 9: ...ontact Corbin Russwin 1 800 543 3658 techsupport corbinrusswin assaabloy com ED2400 ED2400 A Series Surface Vertical Rod Figure 8 3 Preparation continued d Clear Raised Door Molding Device must seat f...

Страница 10: ...im 2 Seat bar in place Fasten device head 2 PRHMS or SNB Figure 10 3 Set bar level Locate end clamp holes 4 Prepare end clamp mounting holes Mount end clamp 2 1 4 20 PRHMS or 3 8 10 mm dia SNB 5 Check...

Страница 11: ...es and Guides Top Strike Detail Figure 11 Shim 2 supplied Start with one Strike plate Ridges face down Strike 2 10 24 x 5 8 MS or 2 10 X 1 WS Flat Head c Prepare Rods Top Rod Connector Top Rod 36 1 8...

Страница 12: ...mm in out PRESS FLUSH To Lenghten Rods Figure 13 Use Rod Extension s to extend Rod to length needed or longer 2 6 12 or 24 Rod Extensions available Cut excess length from end of rod with pin hole Appl...

Страница 13: ...trike as needed 3 Test device action by touchbar by trim and by dogging ADJUST AS NEEDED Upper bolt should retract 1 2 12 mm Bolts extend when door shuts and top strike hits tripping lever 4 Adjust bo...

Страница 14: ...contact Corbin Russwin 1 800 543 3658 techsupport corbinrusswin assaabloy com ED2400 ED2400 A Series Surface Vertical Rod 4 Installation continued e Plastic installation template for ED2400 Exit Devi...

Страница 15: ...Inc All rights reserved Reproduction in whole or in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group Inc is prohibited For installation assistance contact Co...

Страница 16: ...ights reserved Reproduction in whole or in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group Inc is prohibited For installation assistance contact Corbin Russw...

Отзывы: