Assa 1125 Panikutrymningsbeslag
ASSA 179A S4 Emergency exit device
ASSA AB 090890
Edition 3
6/7
Emergency exit device
Regular maintenance intervals: At least once a month
Check all screws and other fastenings and make sure that they are well constricted,
also check that the handles operates with ease.
Open the door by pressing the exit handle downwards. Ensure that the latch moves
freely and get a god engagement in the strike plate when the door is closed. The
exit handle shall easily return to its starting position after closing.
If outside handle is connected, also check the re-entry function after opening by the
exit handle. Check plastic seal strip and that the after glowing exit label is
undamaged and well visible. Replace with a new strip and/or label if necessary.
Lock case
Regular maintenance intervals: At least twice a year
Lubricate both sides of latch and dead bolt at installation and thereafter at least two
times per year.
Use quality grease with high adhesive capacity, such as ASSA Lock Grease or similar.
Strike plate
Regular intervals of at least: Six months
Lubricate the sliding surface between strike plate and latch at installation and
thereafter at least two times per year.
Use quality grease with high adhesive capacity, such as ASSA Lock Grease or similar.
The gap between door and frame shall be 1-3 mm to insure a proper function.
Adjust if necessary.
Lock cylinder
Regular intervals of at least: Six months
Cleaning and lubricating is recommended before summer and winter. Start with use
of ASSA Lock Cleaner and then follow up with ASSA Lock Spray for lubrication.
At high frequency use or hard environment a shorter period of maintenance is
recommended.
Warning!
Never use oil or graphite lubricants in a lock cylinder
MAINTENANCE AND OPERATING INSTRUCTION
!