Page 4
Step 4.
The first mining kit (PCIe riser + graphics card + power connections) should be installed on
slot PCIE2. That is the x16 slot.
Step 5.
Connect the main power supply to the PCIE PWR and SATA PWR headers, and to the standard
24-pin ATX connector and 4/8-pin 12V connector.
Step 6.
Turn on the AC power and install the OS (operating system).
Step 7.
After finishing the OS installation, please install the graphics driver.
Step 8.
Reboot the system to enter the OS and make sure the graphics driver is installed correctly.
Step 9.
Go to device manager to check if the graphics card is detected properly. Shut down the system
and then turn off the AC power.
Step 10.
Install the second mining kit on the top PCIe x1 slot (which is closest to CPU) and repeat steps
3, 4, 8 and 9.