![Ashley 24AF Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/ashley/24af/24af_owners-manual_2982334011.webp)
USSC
Page 11
Your furnace is designed to be added on to existing duct
work and operate either with or without another heat source
such as a gas furnace. The following diagrams illustrate
acceptable ways of ducting your furnace.
Clearance to Combustible Materials
Your Furnace has been tested to determine the SAFE clear-
ances to combustible material. The clearances are printed
on the label located on the back of the furnace. The chart
on this page also states these minimum clearances. Make
sure you follow these when choosing your furnace loca-
tion.
Any hot air plenum connection to a furnace must be con-
structed of metal.
NOTE: INSTALL ONLY ON A NON-COMBUSTIBLE FLOOR.
Clearance to Combustibles
Furnace to back wall
30"
Furnace to side wall
12"
Pipe to back wall
18"
Pipe to side wall
18"
Furnace to ceiling
30"
Ductwork to ceiling
18-6-1"
PLENUM
18"
18"
6"
1"
3'
3'
30"
18"
18"
12"
12"
6"
To connect a Solid Fuel Furnace to a chimney flue
pipe serving another appliance, it's suggested you check
local building codes.
SOLID FUEL
FURNACE
EXISTING
FURNACE
EXISTING
FURNACE
Содержание 24AF
Страница 27: ...USSC Page 27 Notes ...