2
Assembly
Screw eye
Before commencing, please read these instructions
completely, identify the parts and note the
assembly sequence.
Finish
Your e-Spinner 3 has been lacquered prior to
assembly. If desired Ashford Wax Finish may be
applied to further enhance its appearance.
ASSEMBLY INSTRUCTIONS FOR
THE ASHFORD e-Spinner 3
Tools Required
(small hammer)
1.
Squeeze and slide the stainless-steel yarn
guides onto the flyer arms.
Note the nylon eyes are on the same side.
NOTE:
when spinning at higher RPM it may be
necessary to squeeze & rotate whichever yarn
guide isn’t being used to achieve perfect balance.
2.
Cut the nylon brake band into 2 pieces, 35 cm
for the brake band and 65 cm (14” and 25 ½”) for
the lazy kate. Tie the 35 cm (14”) piece to one of
the springs attached to a screw eye. Then tie the
spring to the brake band allowing approx. 270mm
– 280mm (10 1/2 – 11”) between the springs. See
illustration. Thread the tail of the nylon brake band
down the inside of the spring & trim off surplus.
3.
Thread the screw eye with the tension
spring and brake band attached, into
the pilot hole in the left-hand side.
4.
Thread the screw eye into the pilot
hole in the right-hand side.
270mm – 280mm (10 1/2 – 11”)