Ashford COUNTRY SPINNER 2 Скачать руководство пользователя страница 4

4

x

2

x

2

x

2

Front

Back

x

4

Squeeze

Thread the flyer hooks 
into the flyer arms.
Squeeze and slide the 
stainless steel yarn guides 
onto the flyer arms.

Attach the front flyer bearing 
with the large slot to the top 
front rail with 19mm (3/4”) 
screws. 

CHECK:

 The front top rail has 

provision for the flyer brake.
Attach the back flyer bearing 
with the small slot to the top 
back rail with 19mm (3/4”) 
screws.

Assemble the bobbin by aligning the screw holes in the bobbin end, whorl and long end of the bobbin 
centre. Then push the bobbin end and whorl onto the bobbin centre keeping the holes aligned and 
secure with 50mm (2") round head screws. Align the screw holes in the other bobbin end and short end 
of the bobbin centre. Push the bobbin end onto the bobbin centre keeping the holes aligned and secure 

with 25mm (1") round head screws.

Содержание COUNTRY SPINNER 2

Страница 1: ...ace the item To validate our guarantee please visit our website or write to us Ashford Handicrafts Limited Factory and Showroom 415 West Street PO Box 474 Ashburton 7700 New Zealand Telephone 64 3 308...

Страница 2: ...ained The Silver Beech tree is a native of New Zealand and has a lovely variety of colour and grain For a silky smooth matt finish use the Ashford Wax Finish to enhance the natural colours and charact...

Страница 3: ...3 Real Scale Hardware List x4 x2 x10 x10 x10 x1 x1 x16 x2 x2 x2 x4 x1 x2...

Страница 4: ...the back flyer bearing with the small slot to the top back rail with 19mm 3 4 screws Assemble the bobbin by aligning the screw holes in the bobbin end whorl and long end of the bobbin centre Then push...

Страница 5: ...oth ends of the rails Locate the dowels on one end of the top front rail the top back rail both wheel support rails and the treadle rails into the holes on one side of the frame Then loosely attach wi...

Страница 6: ...osely attach all 5 rails with 50mm 2 bolts and barrel nuts Support the wheel and carefully lay the Spinner on its back to attach the treadle rail Sit the Spinner back on its feet on a level surface CH...

Страница 7: ...gned Then carefully tap the hub pin into position x1 Insert the crank through the ball bearing in the front wheel support through the wheel and into the ball bearing in the rear wheel support If tight...

Страница 8: ...to the treadle rail with 16mm 5 8 screws Lay the Spinner on its back Position the treadle boards against the hinges Locate the metal cover plates into the polyurethane hinges CHECK The treadle boards...

Страница 9: ...sintoplace Repeat this sequence for the rear conrod and the left treadle board Slide the inner shell of the conrod universal joint onto the crank until it clicks into the groove Lay the Spinner on its...

Страница 10: ...bobbin lead and will require very little tension to draw the yarn onto the bobbin Only apply a minimum tension Apply a drop of oil to the flyer shaft and slide the bobbin onto it Then position the fl...

Страница 11: ...it stretching Ratio Slow 3 1 Use this ratio for extra bulky yarns with the least twist Medium 4 1 Use this ratio for medium to bulky yarns Fast 5 1 Use this ratio for fine to medium bulky yarns and p...

Страница 12: ...drive belt on the slow ratio Loosen the leather brake so there is no tension on the flyer shaft Tie a 1 5m 5 leader to the bobbin wrap it around the flyer hooks out through the flyer orifice Start tre...

Отзывы: