ASE Citadel CIT02 Скачать руководство пользователя страница 4

The Above Deck Unit (MC05G) has the antenna and tranceiver all contained in one unit.

ABOVE DECK UNIT (ADU)

1m (3.2ft)

.15m (.5ft)

above structure

8

clearance angle

clear 360° view 

to sky/horizon

THERE ARE SOME CRITICAL INSTALLATION DETAILS BELOW. PLEASE REVIEW CAREFULLY.

1) 

Although a funnel installation is recommended as a steath solution, 

    this device is not sutiable for all funnels. Be sure to install in a 
    location that does not exceed 70° C or damage can occur.

2) 

The ADU needs 360° line-of-site to 8° off horizon to be in constant

      contact with the satellites. Locate the centerline of the ADU at the
      same height as the retaining wall and 1 M inward.

3) 

The Universal Pipe Mount supports the installation of horizontal or

      vertical pipes of 1” to 2” in diameter. Mount the antenna with the 
     “seam” parallel with the horizon and keep blockage to a minimum.

     Once you have identified your preferred location of antenna 

     installation, adjust the V-Bolts to accommodate either a vertical 
     or horizontal placement. 

12.7 cm

15.3 cm

28 cm

to below deck equipment

Cable Routing and Attachment to the Antenna

Choose the best pathway and route the cable from the antenna to the 
Citadel location. If extensions are used, connect these as needed. Care must 
be taken when routing the cable. The max connector diameter needs to be
considered when passing through holes or running in conduit. The max bend
radius is important to consider to prevent damaging internal wires.

ver. 1.0

Cable Diameter
Max Connector Size
Max Bend Radius
Max Temperature

.325” (8.26mm)
1.25” (31.75mm)
.98” (25mm)
105°C

Отзывы: