ASSEMBLY, INSTALLATION, OPERATION &
MAINTENANCE MANUAL
9.4M Earth Station Antenna
OM94 Revision M
Page 1
1 RECOMMENDED TOOLS & FOUNDATION PREPARATION
The following sections offer information related to preparing to assemble/install the 9.4m ESA, such as
recommended tools, foundation preparation and the details of the A-325 tensioning procedure required for
the tightening of all A-325 hardware.
1.1 RECOMMENDED TOOLS
ASC Signal supplies all appropriate hardware/parts required for installation of the 9.4m ESA. All tools
needed for installation, however, should be provided by the installation crew. ASC Signal recommends the
following tools (Table 1-1) be used for installation of the 9.4m ESA:
NOTE: The tools listed in the below table are subject to change without notice. Consult assembly
instruction documents, drawings, and/or ASC Signal Tech Support for confirmation.
Table 1-1: Recommended Tools
TOOL
SIZE
QUANTITY
Open End or Combination Wrenches
7/16 Inch
9/16 Inch
7/8 Inch
3/4 Inch
1/2 Inch
1-1/16 Inch
1-1/4 Inch
1-1/2 Inch
1-3/4 Inch
2 Inch
2
2
2
2
2
2
2
2
2
2
Crane
15 Ton Minimum Capacity, extended end 1
3/8” Diameter Nylon Choker
6 Foot
3 Foot
1
1
1/2" Diameter Choker
16 Foot
4
Shackles
5/8 Inch
4
Ladders
25 Foot Extension Ladder
12 Foot Stepladder
2
2
Puller Hoist
1 Ton
1
Hex Bit Socket
1/2 Inch
1
Drive Sockets
7/16 Inch
1/2 Inch
3/4 Inch
7/8 Inch
1-1/16 Inch
1-1/4 Inch
1-1/2 Inch
1-3/4 Inch
2 Inch Deep, 1 Inch Drive
2
2
2
2
2
2
2
2
2
Calibrated Torque Wrench
250 ft-lbs
1
4x Torque Multiplier
1 Inch Drive
1
Adjustable Wrench
8 Inch
1
Spud Wrench
1-1/4 Inch
1
Содержание CPI 9.4M