
I n d e x
I -2
Installation
AC power 1-14
AMS link connections 1-12
device connections 1-12
electrical interference 1-14
host connections 1-12, 18
host connections to hub 1-20, 21
hub location 1-14
humidity requirements 1-14
network connections (BNC) 1-12, 26
NMS (OOB) connections to hub 1-31,
32, 33
NMS connections 1-22
NMS connections to hub 1-25, 26
overview 1-11
overview of procedure 1-12
package contents 1-14
power up hub 1-16
pre-test hub 1-16
prerequisites 1-11
temperature requirements 1-14
terminate AMS link 1-32, 33
tools 1-12
unpacking 1-14
wiring closet 1-3
Installation 3-1
J
Jumpers 2-7
L
LEDs
interpretation 2-1
LEDs 4-1
LEDs B-1
LEDs, overview xii
Limits, data transmission path 3-10
Link Integrity vii
Link integrity test, disabling and enabling 1-9
Link Integrity Testing
disabling A-1
Link Selection
auto-select priorities 1-8
Location requirements 1-14
M
MAC address 1-8
Modem dial string, default setting 1-10
N
Network configuration
maximum data path 3-10
Network configurations 3-6
Network connections (BNC) 1-26
Network connections, rear panel 1-6, 7
NMS connections (OOB) to hub 1-31, 32, 33
NMS connection to hub 1-22
Network management station 1-11
NMS connections to hub 1-25, 26
Node age time, default 1-10
O
Operating environment B-2
Out-of-band network management
connections 1-31, 32, 33
Overview of the SmartHub x
P
PC, set switch when using 1-9
Pinouts and Cable Specifications C-1
Pinouts C-1
Polarity, when using TP-MAUs 2-11
Ports B-1
Power source, for hub 1-14
Power up hub 1-16
Pre-test host connections 1-18
Pre-test hub
LED display 1-17
Pre-test hub 1-16
Q
Quick View section 1-1
Содержание AsanteBridge 1012
Страница 1: ...A s a n t é H u b 1 0 1 2 I n s t a l l a t i o n G u i d e ...
Страница 76: ...Appendix A A 2 ...