EN
AS Strömungstechnik GmbH
www.asstroemungstechnik.de
Version date: 09/2020
16
5.2 Tests prior to assembly
1. Use the label on the container to
check whether the desired chemical is
in the container.
»
In addition, an electronic chemical
comparison should be carried out via
barcode or RFID.
2. Make sure that the container is placed
in a dust-free environment.
NOTE
Contamination and debris can limit the
functionality of the dispense head and
lead to premature wear of seals and
thus to leaks.
3. Carry out a visual inspection for the
following points:
•
Contamination and adhesion of
chemical residues. The dispense
head must be clean.
•
Make sure there is no damage
such as cracks, etc.
Assembly/commissioning
4. Check the connecting couplings. They
must not be too tight or too loose.
»
Use the correct tightening torque that
matches the screw connection.
Please use recommended torque
specifications of the respective man-
ufacturer when tightening nuts and
screws.
»
The screw connections must be se-
cured against unwinding.
When using flare connections,
see also AS flare and assembly in-
structions.
Содержание MH2-D Series
Страница 1: ...Operating instructions Translation Dispense heads of the series M2 Series ...
Страница 28: ......