![Aruba 6300F Series Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/aruba/6300f-series/6300f-series_installation-safety-and-regulatory-information_2979247009.webp)
Preview of installing an Aruba 6300F/M switch
NOTE: This section previews the steps for installing the Aruba 6300F/M switches. To find detailed switch
installation steps, information on configuration tools, and other instructions and information, see the
latest Installation and Getting Started Guide for your switch.
1. Prepare the installation site.
2. Unpack the switch and verify that you have received the correct parts.
3. Install a power supply if the switch was not shipped with a power supply already installed.
4. Connect power to the switch and wait for the health LED to turn green after the switch passes the self-test, then
remove power from the switch.
5. Mount the switch.
WARNING: Mounting restrictions apply. See the "Warning" under "Installation precautions and
guidelines".
6. Connect the switch to a power source.
7. (Optional) Install transceivers.
8. Connect the network cables.
9. Configure the switch for network operation.
Documentation feedback
Send any errors, suggestions, or comments to Documentation Feedback ([email protected]).
Page 9