Artos F907-29 Скачать руководство пользователя страница 3

 

⃞ 

Read through all of these instructions

 

⃞ 

This product is part of a custom shower or bath system.  Carefully 

 

plan the installation before beginning.  Decide location and 

 

spacing of all components in the system 

 

Included Components: 

 

F903-15 

Pressure Balance Mixer Valve x 1 

 

F903-12TKCH 

Trim Kit (Plate & Handle) x 1 

 

F902-12 

Water Outlet Elbow x 1 

 

F902-6 

Adjustable Handshower Holder x 1 

 

F901-12 

Bidet Handshower x 1 

 

F902-8 

60” Flexible Hose x 1 

 

⃞ 

Observe all local building and plumbing codes and shut off the main 

 

water supply before commencing pipe work

 

⃞ 

If soldering close to the valve, remove the cartridge to avoid dam-

 

age from the heat.

 

                                                           PRIOR TO INSTALLATION 

907290712 

                                                                           SPECIFICATIONS  

Recommended flow pressure between 45 and 75 psi.  Above 90 psi it may be nec-
essary to install a pressure reducer.  Maximum operating temperature 176

°

F.  This 

unit is for use with shower heads rated at 2.5 GPM  ( 9.5L/min )  or higher. 
Certified to ASSE standard 1016. 

Содержание F907-29

Страница 1: ...712 www artos westover com Installation Guide Bidet Handshower Kit Model F907 29 This publication is for illustrative purposes only and we reserve the right to change details at anytime as deemed nece...

Страница 2: ...fig A DIMENSIONS 907290712...

Страница 3: ...Holder x 1 F901 12 Bidet Handshower x 1 F902 8 60 Flexible Hose x 1 Observe all local building and plumbing codes and shut off the main water supply before commencing pipe work If soldering close to t...

Страница 4: ...ply pipes to the valve observing the mini mum and maximum dimensions from the pipe center to the finished wall surface see Fig B Ensure that the valve is upright and level then secure to the stud work...

Страница 5: ...fig B INSTALLATION DIMENSIONS 907290712 fig C SERVICE STOPS...

Страница 6: ...rear of escutcheon it is only necessary to seal the top half to prevent penetration of water into the wall Push escutcheon over valve body to make a seal against the wall It may be necessary to light...

Страница 7: ...the temperature stop turn it counter clockwise or in the direction as shown on the temperature stop and replace it at this orientation Replace the cartridge securing nut and tighten with a wrench NOTE...

Страница 8: ...able to give some tolerance 2 If rough in is prepared before wall finish thickness is known set outlet at least 2 5 behind the cement board and use con nector and nipple to achieve correct positioning...

Страница 9: ...PARTS DIAGRAM FOR VALVE TRIM KIT 907290712...

Страница 10: ...ons in the US Canada and Mexico North America Commercial Industrial or business uses are warranted for a period of one year from the original date of purchase This warranty is non transferable and app...

Отзывы: