background image

 

Mixed water temperature 

 

Maximum:  120°F  

 

Hot Water Supply Temperature 

 

Maximum:  185°F

 

   Minimum:  50°F higher than mixed

 

 

Advisable:  150°F - 160°F

 

⃞ 

Minimum difference between hot and mixed temperature 50°F 

 

Operating Pressure 

⃞ 

Maximum:   

125psi

 

⃞ 

Minimum:   

20psi

 

⃞ 

Recommended:  30 - 95psi

 

⃞ 

Operating pressures (on hot and cold lines) should be kept as balan-

 

ced as possible, in order to assure the maximum efficiency.

 

 

Standards 

⃞ 

ASSE 1016.ASME A112.18.1/CSA B125.1 Certified

 

Operating Specifications 

904A30513 

 

⃞ 

Read through all of these instructions 

   This product is part of a custom shower or bath system.  Carefully 

 

plan the installation before beginning.  Decide location and 

 

spacing of all components in the system (see typical systems at the 

 

back of this booklet). 

 

The top outlet is for the shower components and the bottom outlet is 

 

for a tub spout. Blank off the tub outlet if not using 

⃞ 

Observe all local building and plumbing codes and shut off the main 

 

water supply before commencing pipe work

 

⃞ 

If soldering close to the valve, remove the headwork to avoid dam-

Prior to Installation 

Содержание F904A-VO

Страница 1: ...A30513 www artos westover com Installation Guide 3 4 THERMOSTATIC VALVE F904A VO This publication is for illustrative purposes only and we reserve the right to change details at anytime as deemed necessary ...

Страница 2: ...A B125 1 Certified Operating Specifications 904A30513 Read through all of these instructions This product is part of a custom shower or bath system Carefully plan the installation before beginning Decide location and spacing of all components in the system see typical systems at the back of this booklet The top outlet is for the shower components and the bottom outlet is for a tub spout Blank off ...

Страница 3: ...d supply to the right Ensure that the valve is upright and level and secure it to a ply wood backer if there is room or secure pipes firmly to framework Provide a hole min 4 max 5 diameter in the rough wall material for access to the stops Install the Thermostatic Valve 904A30513 Measurements ...

Страница 4: ...T Outlets 1 each side 2 x 3 4 NPT Inlets 1 each side Installation Depth Complete the installation Remove filters stops and flush the supply lines to remove any de bris Re fit the stops filters Connect outlet s to the chosen controls Finish the wall surface ...

Страница 5: ...904A30513 ...

Страница 6: ...904A30513 ...

Страница 7: ......

Страница 8: ...se faucet thoroughly and blot dry any water from the surface after each use ARTOS faucets are guaranteed for life against leaks and fin ishing defects for as long as the original purchaser owns it Damage caused by accident misuse abuse improper installation im proper cleaning or alteration will void the warranty This warranty does not cover replacement parts where damage is caused by normal wear a...

Отзывы: