IN
FL
OW
INFLOW TUBING SET-UP
Green tubing hub
Remove the orange clip
Close the inflow door
(c) and lock (d)
Spike the saline bags
Insert the connector
into the pump pressure
coupler
Unlock (a) and open
the inflow door (b)
Insert the green tubing
hub next to the green
mark
Wrap the thicker
tubing between the
hubs and around
the rollers
1
6
8
2
7
3
4
5
Rollers
Inflow door
Tubing
sensor
coupler
Clear tubing
hub
Close inflow latch
Remote foot
switch connector
Power
button
(a)
(b)
(d)
(c)
Turn on the system, and wait until the self-diagnostic testing has finished before attaching the tubing.
Stretch the thicker
tubing to insert the
clear tubing hub
Содержание CONTINUOUS WAVE
Страница 6: ...NOTES ...