background image

4

Safety precautions are important to follow throughout the construction of your building.

•Care must be taken when handling various
pieces of your building since some contain
sharp edges. Please wear work gloves, eye
protection and long sleeves when assembling
or performing any maintenance on your build-
ing.

•Practice caution with the tools being used in the
assembly of this building. Be familiar with the
operation of all power tools.

•Never concentrate your total weight on the
roof of the building. When using a step ladder
make sure that it is fully open and on even
ground before climbing on it.

•Keep children and pets away from worksite to
avoid distractions and any accidents which
may occur.

•Do not attempt to assemble the building if parts
are missing because any building left partially
assembled may be seriously damaged by light
winds. Call 1-800-851-1085

•Do not attempt to assemble the building on a
windy day, because the large panels acting as a
"sail", can be whipped about by the wind making
construction difficult and unsafe.

SAFETY FIRST....

     A4

safety edge

safety edge

sharp edge

sharp edge

Содержание CL72-A

Страница 1: ...HEN HANDLING METAL PARTS 709020509 Model No CL72 A Owner s Manual Assembly Instructions BK01 Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof Edge Wall to Wall Opening Size Size Sq Ft Cu Ft Width Depth Height Width Depth Height Width Height 7 x 2 86 5 8 x 28 1 4 15 95 87 1 4 28 1 2 81 5 8 83 7 8 25 1 2 81 50 1 4 69 2 1m x 0 6m 220 0cm x 71 8cm 1 4m2 2 7...

Страница 2: ... by mail order or at your local dealer or you may construct a foundation and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these numbers before the must ...

Страница 3: ...Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of foundation you wish to use in order to form a comple...

Страница 4: ...ntrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions and any accidents which may occur Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call...

Страница 5: ...ricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the ...

Страница 6: ...g bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8cm steel channels plus five heavy duty snap in hangers and a small tool holder for screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arro...

Страница 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7 ...

Страница 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8 ...

Страница 9: ... be at least 4 10 2cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your foundation 1 x 4 s 19mm x 89mm will be removed once the concrete cures Concrete Sheet of 6 mil plastic We recommend for a proper strength concrete to use a mix of 1 part cement 3 parts pea sized gravel 2 1 2 parts clean sand Prepare the Site Construct a F...

Страница 10: ...allation instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6mm x 51mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6mm x 152mm Lag Screws ArrowAnchoringKit ModelNo AK4or60298 Recommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instruction AnchoringintoWood Post U...

Страница 11: ...83 Roof Trim Cap 4 66463 Swivel Staple 1 66714 6 32x7 16 11mm Flat Hd Bolt 16 66646 Washer 164 5 sheets of 40 66645 6 32x3 4 19mm Screw 7 66148 Cap Protector 14 65004 8Ax5 16 8mm Screw 154 65923 8 32x3 8 10mm Bolt 68 65941 6 32 Hex Nut 23 65103 8 32 Hex Nut 68 Hardware BK11 66604 Hinge 4 ...

Страница 12: ...37 Left Roof Trim 1 11 9438 Front Roof Trim 1 12 9439 Peak Trim 1 13 9440 Door Header 1 14 9441 Rear Header 1 15 9442 Starter Strip 1 16 9443 Roof Panel 1 17 9448 Right Gable 1 18 9449 Left Gable 1 19 9454 Shelf 4 20 9446 Right Front Corner Panel 1 21 9447 Left Front Corner Panel 1 22 9445 Wall Panel 2 23 9444 Rear Corner Panel 2 24 9936 Right Door 1 25 9937 Left Door 1 26 9452 Right Door Jamb 1 2...

Страница 13: ...13 Assembly by Key No BK13 ...

Страница 14: ...ront wall and roof It is made up of two pieces 1Positioning the door header as shown attachastarterstriptohead er using four screws where shown Parts Needed For Door Header Assembly 9440 Door Header one 9442 Starter Strip one STEP 1 9440 9442 Screw ...

Страница 15: ...ides into brace Fasten brac es to doors using two screws 4Using an awl ice pick or nail push holesthroughfoamboardatthehasp andstapleholes Attachhasptoright door and swivel staple to left door using 6 32x3 4 19mm flat head bolts and 6 32 hex nuts Tighten nuts through foam board using a needle nose pliers until they are against inside of door panel 5Position astragal to right door as shown and fast...

Страница 16: ...ethefloorframediagonally When the diagonal measurements are equal the floor frame is square NOTE Do not fasten the floor frame to your foundation at this time You will anchor the building after it is erected The floor frame must be square and level or holes will not align Parts Needed For Floor Frame Assembly 8984 Side Floor Frame two 9429 Ramp one 9430 Front Rear Floor Frame two STEP 1 Level 9430...

Страница 17: ...nels to the rear corners as shown The crimped rib should go under the rib of the adjacent panel Fasten overlap ping rib using 2 screws and a bolt with nut NOTE Be careful to install the correct panel in each position as shown 3Fastenthesidewallanglesacross the top of the side panels using screws 4Double check the part numbers of the corner wall panels before pro ceeding The floor frame must be squ...

Страница 18: ...s 1Fasten the rear wall angle across the top of the rear wall using four screws 2Fastenthedoorheaderacrossthe topofthefrontwallsusingtwoscrews where shown Parts Needed For Frames 9434 Rear Wall Angle one Door Header Assembly one 1 9434 STEP Screw DoorHeaderAssembly 2 STEP FRONT ...

Страница 19: ... panels at the top and bottom with screws 2Fasten overlapping ribs using two screws and a bolt with nut 3Positioning the rear header with small flange on top fasten to rear wall angle using seven screws 9441 Rear Header one 9445 Wall Panel two Parts Needed For Wall Panels Rear Header STEP 3 9441 STEP 2 Crimped Rib Underneath STEP 1 Nut STEP 3 Panels rest on frame as shown Screw Bolt 9445 9445 ...

Страница 20: ...gables to header in the rear corners using a screw 2Position roof rafters across width of building under rear header with tab on top of door header Fasten using two screws Parts Needed For Gables Roof Rafters 9433 Roof Rafter three 9448 Right Gable one 9449 Left Gable one 9433 STEP 2 9449 STEP 1 Bolt Screw Nut 9448 ...

Страница 21: ...rner panel with one bolt and nut as shown 2Fasten the top of the door jamb to the door header with two screws Do the same for the bottom into frame Repeat steps 1 through 2 for the op posite door jamb Parts Needed For Door Jambs 9452 Right Door Jamb one 9453 Left Door Jamb one TOP VIEW TOP VIEW DoorHeader DoorHeader Screw Screw Screw Bolt Bolt Hex Nut 9453 9452 STEP 2 ...

Страница 22: ...d For Roof Panel Trim 9436 Right Roof Trim one 9437 Left Roof Trim one 9438 Front Roof Trim one 9439 Peak Trim one 9443 Roof Panel one 3Fasten front roof trim to the front flange on roof panel using five bolts and nuts as shown 4Attach the right left roof trim to the ends of the roof panel on each side of the building using two screws on each trim 5Fasten a roof trim cap to the peak of the right a...

Страница 23: ...holderacross theupperrearwallusingeightscrews from the outside Parts Needed For Shelving Mid Frame Track 9431 Mid Wall Frame one 9454 Shelf four 9522 Track Tool Holder one Tool Hooks slide along track to any desired position Keeps rakes shovels brooms and much more in a safe and accessible location The Screw Driver Holder is engineered for all types of hand tools such as screwdrivers and pliers A ...

Страница 24: ...h 7 16 11mm flat head bolts and 6 32 hex nuts NOTE Be sure the heads on hinge pins are all installed toward the top 2Thehaspandstaplecanbeusedto keep doors closed or used with a padlock not supplied to lock doors When the spring latch is engaged with hole in door header this will hold left door closed when not in use 709020509 STEP 2 7 16 11mm Flat Head Bolt and 6 32 Hex Nut STEP 1 ...

Отзывы: