background image

SOME FACTS ABOUT RUST

Rusting is a natural oxidizing process that occurs 

when bare metal is exposed to moisture. Problem 

areas include screw holes, unfinished edges, or 

where scrapes and nicks occur in the protective 

coating through normal assembly, handling and use. 

Identifying these natural rusting problem areas and 

taking some simple rust protection precautions can 

help to stop rust from developing, or stop it quickly 

as soon as it appears.

1. Avoid nicking or scraping the coating surface, 

inside and out.

2. Use all the washers supplied. In addition to 

protecting against weather infi ltration, the washers 

protect the metal from being scraped by the screws.

3. Keep roof, base perimeter and door tracks free of 

debris and leaves which may accumulate and retain 

moisture. These can do double damage since they 

give off  acid as they decay.

4. Touch up scrapes or nicks and any area of visible 

rust as soon as possible. Make sure the surface is 

free of moisture, oils, dirt or grime and then apply 

an even fi lm of high quality touch-up paint.

723500617

BU36

ED1012 B1 ED1012AP B1 ED1012L A1 ED1012Z SBVD1012 E1

697.68619 B1 VD1012 E1 VD1012EU E1 VDGY1012 A

VDGY1012EU A

WR1012

WR1012EU

Содержание 697.68619 B1

Страница 1: ...115 Sq Ft 734 Cu Ft 10 7 m2 20 8 m3 BUILDING DIMENSIONS Size rounded off to the nearest foot CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP FOR SAFETY SAKE PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION WEAR GLOVES WHEN HANDLING METAL PARTS Missing Parts Questions on Assembly Call 1 800 851 1085 or ass...

Страница 2: ...codice QR in basso PT Manual de montagem disponível em outros idiomas online Digitalize o código QR abaixo para obter acesso DT Samlingshåndbog i yderligere sprog til rådighed online Scan QR kode nedenunder for at få adgang SK Na internete je k dispozícii návod na zostavenie v ďalších jazykoch Dostanete sa k nemu naskenovaním kódu QR CZ Návod k montáži v dalších jazycích je k dispozici v online ve...

Страница 3: ...w s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the pa...

Страница 4: ...rk Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of base you wish to use in order to form a complete ...

Страница 5: ...l weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions and any accidents which may occur Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call 1 800 851 1085 ...

Страница 6: ...that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plas...

Страница 7: ...nto a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy duty snap in hangers and a small tool holder for screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all Arrow stora...

Страница 8: ...g Accessories SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re delivery charge assessed by the carrier ORDERING ACCESSORIES A08 02 13 Option 1 Accessories can be purchased through arrowsheds com Option 2 Order accessories by telephone using your MasterCard or V...

Страница 9: ...er yard To construct the base follow instructions and diagram Construct frame using 10 penny galvanized nails Measure 16 24 40 6 cm 61 0 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concrete Slab The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support for the ...

Страница 10: ...instruction Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6 mm x 152 mm Lag Screws Arrow Anchoring Kit Model No AK4 or 60298 Recommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instruction Anchoring into Wood Po...

Страница 11: ...ower Door Guide 4 66183 Roof Trim Cap 2 right 2 left 67468 Peak Cap 2 66045 Handle 2 66646 Washer 276 7 sheets of 40 Hardware SX11 ctr 6228 Track Support 2 66769 Door Slide 4 65004 8Ax5 16 8 mm Screw 410 65923 8 32x3 8 10 mm Bolt 129 65900A 10Bx1 2 13 mm Black Screw 8 Packed with Screws 65103 8 32 Hex Nut 129 11 ...

Страница 12: ... 6301 Vertical Door Brace 2 13 8736 Rear Siding 6 14 8737 Front Siding 6 15 10472 Right and Left Doors 2 16 3719 Door Handle Brace 2 17 6403 Door Track Splice 1 18 6014 Side Roof Trim 2 19 6015 Side Roof Trim 4 20 6868 Ridge Cap 1 21 6869 Ridge Cap 2 22 9366 Door Track 2 23 10396 Rear Wall Angle 2 24 6635 Gable Brace 2 25 10568 Roof Beam 8 26 10392 Side Floor Frame 4 27 8936 Rear Floor Frame 2 28 ...

Страница 13: ... 2 6 22 29 29 3 23 30 23 13 13 13 13 13 29 29 29 29 29 29 29 29 14 14 14 14 14 30 30 30 6 6 6 6 6 6 6 6 6 6 6 2 27 26 26 26 22 15 15 12 1 11 10 16 3 28 11 11 3 19 21 8 9 25 4 5 24 5 4 7 7 7 7 7 7 8 9 25 25 25 25 25 25 25 19 19 19 18 18 24 20 21 BU13 32 32 32 32 ...

Страница 14: ... pieces will align when the pieces are positioned with correct amount of overlap See the illustrations below for the proper over all length of the side and rear floor frames Join the frames by inserting four five bolts into each frame set as shown 3 Double check the length of each and set these pieces aside for later use Step 1 SV14 ctr Parts Needed For Floor Frame Assemblies 8934 Ramp 1 9367 Fron...

Страница 15: ... one bolt in the single large hole 2 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with two bolts thru the second set of large holes from each end 3 Double check the length of each and set these pieces aside for later use 10396 Rear Wall Angle 2 10395 Side Wall Angle 4 STEP 1 10396 10396 Side Wall Angles 140 3 8 356 6 cm 3 3 4 9 5 cm Rear Wal...

Страница 16: ...ake two of the pressed together roof beams and join them as shown to form the main roof beam assem bly Hold the assembly together and fasten with 14 bolts Build only one Doubled Beam Assembly 3 Fasten the other two pressed together roof beams with eight bolts to make the left and right roof beam assemblies 4 Double check the length of each and set these pieces aside for later use Step 3 Parts Need...

Страница 17: ...he underside only Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of door track assembly as shown in the end view 4 Set this piece aside for later use 4 17 NOTE Door Track Splice painted part STEP 1 STEP 2 Long Leg on Top Short Leg on Bottom 9366 9366 6403 66769 6676...

Страница 18: ... the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diagonally When the diagonal measurements are equal the floor frame is square NOTE If using a wood platform or concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected STEP 1 10392 RIGHT REAR 8936 Level 10392 RIGHT FRONT 9367 STEP 2 When ...

Страница 19: ...rner Post 4 Step 6 SX19 ctr Parts Needed For Corner Posts NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to complete the assembly today A partially assembled building can be severely damaged by light winds STEP 1 5288 5288 5288 5288 REAR FRONT SIDE SIDE 5288 FRONT TOP VIEW 5288 5288 5288 8 19...

Страница 20: ...ing 2 screws in each corner Side wall angles overlap rear wall angle in corners Door Track Assembly 1 Rear Wall Angle Assembly 1 Side Wall Angle Assemblies 2 Step 7 SX20 ctr Parts Needed For Top Frames The top frame pieces give rigidity to the side walls and provide a surface for attaching the gables which sup port the roof STEP 2 STEP 1 Short Leg on Top 10395 Wall Angles Must Face Inside Building...

Страница 21: ... 4 screws into rear wall angle and 2 screws into rear floor frame Hint Measure or count holes to de termine if post is centered on angle 2 Fasten splice posts to the sides of building in the same manner 5287 Splice Post 3 Parts Needed For Splice Post Step 8 SX21 ctr STEP 2 5287 FRONT STEP 1 5287 5287 18 21 ...

Страница 22: ...en the top of the door jambs to the door track with 2 screws Do the same for the bottom into frame Notched edge faces toward center of building 7311 Door Jamb 2 Parts Needed For Door Jamb Step 9 SX22 ctr STEP 1 7311 7311 FRONT NOTCHED EDGE MUST FACE CENTER OF BUILDING Washer 8 22 ...

Страница 23: ...h corner and splice post on the sides and 1 on the rear of building Position stud inside top angle and fasten with a screw at the lower hole 9365 1 STEP 2 STEP 3 STEP FASTEN STUD AT LOWER HOLE FRONT 47 9 16 120 8 cm 21 15 16 55 7 cm 29 3 16 74 1 cm 2 Rest bottom tab large hole outside floor frame Do not fasten tab at this time Repeat procedure for the remaining studs around the building 3 Fasten f...

Страница 24: ...iding panels to stud at this overlap 3 Install side siding to the top as before 4 From inside building fasten siding to corner posts and splice post using screws 5 Repeat steps 1 through 4 opposite side of building NOTE Be careful to install the correct panel in each position as shown The floor frame must be square and level or holes will not align 6287 Side Siding 12 Parts Needed For Side Siding ...

Страница 25: ...ner post and door jamb This siding is fastened from the inside using screws into post and jamb 4 Install front siding to complete both front sections 8736 Rear Siding 6 8737 Front Siding 6 Parts Needed For Rear Front Siding Step 12 SX25 ctr 4 STEP STEP 3 STEP 2 1 Front Panels Fasten at Corners Door Jambs from the Inside Fasten Top Center of Last Siding to Stud 8736 8736 8736 Fasten Rear Siding to ...

Страница 26: ...en as one piece Carefully separate them before continuing 1 Apply edge trim to the top edge of the right gables and left gables 2 Attach the four roof beam brackets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable and holes closest together must be on top To avoid mishap on the sharp edge the edge trim must remain in place on the top edge...

Страница 27: ... gable brace us ing a bolt in the bottom hole only 3 Repeat Steps 1 2 for the door track on the front of building except for the track supports fasten as shown Left Gable Assemblies 2 Right Gable Assemblies 2 6635 Gable Brace 2 Parts Needed For Gables Braces Step 14 SX27 ctr STEP 2 STEP 3 STEP 1 6635 Gable Brace Track Supports 6228 Gable 22 3 27 ...

Страница 28: ... double roof beam to the gable brace of the rear gable 3 Fasten the single roof beams small holes on top as shown using bolts and nuts Main Roof Beam Assembly 1 Single Roof Beam Assemblies 2 Parts Needed For Roof Beams Step 15 SX28 ctr STEP 2 STEP 1 STEP 3 Roof Beam Double Roof Beam Single Spread Two Halves Of Roof Beams 12 28 ...

Страница 29: ... 1 Locate all the roof panels by their numbers and place them on the ground alongside the building in their proper positions 2 Position a right roof panel at the back right corner and fasten to the top roof beam using screws 3 Remove edge trim from the left gable under the roof panel 6640 Right Roof Panel FRONT Washer Bolt Gable STEP 1 Nut 5 6 7 8 9 1 3 5 7 2 4 6 8 Front 6640 6640 6641 6641 6529 6...

Страница 30: ... first ridge cap 6869 on thecompletedroofsectionusingbolts and nuts Do not fasten the ends of the ridge cap at this time 5 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts 6641 Left Roof Panel 1 6529 Roof Panel 2 6869 Ridge Cap 1 Step 17 SX30 ctr Parts Needed For Ridge Cap Panels STEP 1 Screws To Roof Beam Screws To Roof Beam STEP 4 Weather Stripping Tape Do not fast...

Страница 31: ... side and overlap the ribs of the next roof panel Continue weather stripping the ridge 3 Install the left 6641 and right roof panel 6640 as you unroll the weather stripping tape and press it down Fasten the lower end of the panels to the side wall angles using screws and washers 4 Fasten the roof panel ribs peak cap and ridge cap together using bolts and nuts 6868 Ridge Cap 1 6529 Roof Panel 4 686...

Страница 32: ...ger overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw 6015 Side Roof Trim 4 6014 Side Roof Trim 2 Parts Needed For Roof Trim Step 19 SW32 ctr Tuck Flange Inward to Fit Inside of Roof Trim Cap STEP 2 Roof Trim Cap STEP 3 STEP 1 6014 6015 6015 Roo...

Страница 33: ...crew 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above and below center connection using 2 screws 4 Insert a second bolt in the door handle and tighten both bolts 5 Put a horizontal door brace onto the top edge and bottom edge and fasten with 1 bolt in the cente...

Страница 34: ...door slides 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Keep this Owner s Manual and Assembly Instructions for future reference STEP 2 Horizontal Door Brace STEP 1 Gable STEP 3 10Bx1 2 13 mm Screw Door Slide Adjustmen...

Страница 35: ...Anchoring Anchor your building at this time Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time Anchoring and Floor Frame XA34 ...

Страница 36: ...rface inside and out 2 Use all the washers supplied In addition to protecting against weather infiltration the washers protect the metal from being scraped by the screws 3 Keep roof base perimeter and door tracks free of debris and leaves which may accumulate and retain moisture These can do double damage since they give off acid as they decay 4 Touch up scrapes or nicks and any area of visible ru...

Отзывы: