background image

THIS

 PAGE

WAS

LEFT

BLANK

INTENTIONALLY

8

Содержание 697.68603

Страница 1: ... cm Missing Parts Questions on Assembly Call 1 800 851 1085 Do not return to dealer they are not equipped to handle your requests Storage Area 74 Sq Ft 487 Cu Ft 6 9 m2 13 8 m3 BUILDING DIMENSIONS Size rounded off to the nearest foot 709040310 Model No CO108 A DK108 LB108 B LX108 A RV108 VS108 A WV108 A YT108 A 697 68603 697 68629 CAUTION SOME PARTS HAVE SHARP EDGES CARE MUST BE TAKEN WHEN HANDLIN...

Страница 2: ...ble by mail order or at your local dealer or you may construct a base and anchoring system of your choice Your assembly instructions provide information on a few methods commonly used to secure and level a storage building Parts and Parts List Check to be sure that you have all the necessary parts for your building All part numbers can be found on the parts All of these numbers before the must agr...

Страница 3: ...mwork Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials These are some basic tools and materials you will need for the construction of your building Decide which method of anchoring and the type of base you wish to use in order to form a comple...

Страница 4: ...ntrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions and any accidents which may occur Do not attempt to assemble the building if parts are missing because any building left partially assembled may be seriously damaged by light winds Call...

Страница 5: ...ricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to protect the metal from being scratched by screws Regularly check your building for loose screws bolts nuts etc and retighten them as necessary Moisture A plastic sheet vapor barrier placed under the ...

Страница 6: ... lag bolt into a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy duty snap in hangers and a small tool holder for screwdrivers pliers etc Holders slide along channel for fully adjustable spacing Great for garage basement or the back of any door Fits all ...

Страница 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7 ...

Страница 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8 ...

Страница 9: ...easure 16 24 40 6 cm 61 0 cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concrete Slab The slab should be at least 4 10 2 cm thick It must be level and flat to provide good support for the frame The following are the recommended materials for your base 1 x 4 s 19 mm x 89 mm will be removed once the ...

Страница 10: ...on instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6 mm x 152 mm Lag Screws ArrowAnchoringKit ModelNo AK4or60298 Recommended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instruction AnchoringintoWood Post Use...

Страница 11: ... Trim Cap 2 right 2 left 66045 Handle 2 66646 Washer 403 11 sheets of 40 65109 8 32AcornNut 4 PackedwithScrews 67468 Peak Cap 6 ArrowLogo 65004 8Ax5 16 8mm Screw 338 65923 8 32x3 8 10mm Bolt 215 65900A 10Bx1 2 13mm BlackScrew 8 PackedwithScrews 65103 8 32HexNut 215 Hardware D11 6228 Track Support 2 66769 Door Slide 4 ...

Страница 12: ... 6227 Roof Beam Brace 2 15 10497 Horizontal Door Brace 4 16 6278 Vertical Door Brace 2 17 9369 Door Jamb 2 18 8936 Rear Floor Frame 2 19 9917 Rear Wall Channel 2 20 6403 Door Track Splice 1 21 9366 Door Track 2 22 9367 Front Floor Frame 2 23 7332 Wall Panel 4 24 9373 Front Wall Panel 2 25 5209 Roof Panel 4 26 6636 Gable Brace 2 27 8937 Side Floor Frame 4 28 9922 Side Wall Channel 4 29 8841 Side Wa...

Страница 13: ...12 29 8 4 30 29 31 36 30 2 7 4 5 9 23 10 4 6 26 14 5 7 37 30 30 28 10 10 18 13 31 30 19 25 33 10 19 29 12 25 6 30 30 26 14 36 30 4 8 11 10 2 9 23 28 28 27 27 18 22 22 15 15 1 27 24 3 17 17 34 16 24 3 16 35 34 35 27 21 15 9 23 20 15 21 9 23 10 28 29 32 ...

Страница 14: ...hese pieces will align when the pieces are positioned with cor rect amount of overlap See the illus trations below for the proper overall lengthofthesideandrearfloorframes Join the frames by inserting four five bolts into each frame set as shown 3 Double check the length of each and set these pieces aside for later use Step 1 A14 Parts Needed For Floor Frame Assemblies 8934 Ramp 1 9367 Front Floor...

Страница 15: ...l angle pieces as shown in the figure and fasten them together with one bolt in the center hole 4 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with one bolt in the center hole 5 Double check the length of each and set these pieces aside for later use 5986 Rear Wall Angle 2 9917 Rear Wall Channel 2 9922 Side Wall Channel 4 8841 Side Wall Angl...

Страница 16: ...t 2 Take two of the pressed together roof beams and join them as shown toformthemainroofbeamassembly Hold the assembly together and fas ten with 14 bolts Build only one Doubled Beam Assembly 3 Fasten the other two pressed together roof beams with eight bolts to make the left and right roof beam assemblies 4 Double check the length of each and set these pieces aside for later use Step 3 D16 Parts N...

Страница 17: ...iding doors and reinforces the frontwall Itismadeupofthreepieces 1 Using the door track splice painted join the door track galvanized pieces end to end as shown 2 Insert four screws from the under side only Hint The holes in the top side of the doortrackassemblyareforfastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of door track ass...

Страница 18: ... At the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood platform or concrete slab do not fasten the floor frames to your base at this time You will anchor the building after it is erected STEP 1 8937 RIGHT REAR 8936 Level 8937 RIGHT FRONT 9367 STEP 2 Wh...

Страница 19: ... 2 9373 Front Wall Panel 2 8470 Corner Panel 4 Step 6 L19 Parts Needed For Corners NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the assembly today A partially assembled building can be severely damaged by light winds Each screw and bolt in the wall re quires a washer 4 Double c...

Страница 20: ...assemblies across the middle of the side panels using screws Fasten overlaps in rear corners with screws 5 Fasten the door track assembly holes on top across the top of the front wall panels using screws See the figure NOTE The wall channels behind the front wall panels will be installed in a later step Door Track Assembly 1 Rear Wall Angle Assembly 1 Side Wall Angle Assemblies 2 Rear Wall Channel...

Страница 21: ... holes line up with the holes in the frame 3 Fasten the wall panels at the top and bottom with screws 4 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs as before 5 When you have attached all wall panels in the correct positions the building will look like this 21 STEP 1 7332 STEP 2 7332 STEP 4 Bolt and nut does not go thru wallchannel at overlap STEP 3 Crimp...

Страница 22: ...at this time 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown 3 Fasten the center of the door jamb to the front wall panel and the front wall channel with two screws 4Fastenthetopofthe doorjambto the door track with two screws Do the same for the bottom into frame Repeat steps 2 through 4 for the opposite door jamb 22 Acorn Nut Hex Nut 9369 F R O N T Screw Screw ...

Страница 23: ...les on the left and right sides usingfourbolts washersandnutson each side This part of the gable is called the outer gable leg 3 Attach the four roof beam brackets to the outer gable legs us ing two bolts in the two bottom holes of the four holes that align Parts Needed For GableAssemblies Step 10 D23 6108 Large Right Gable 2 6109 Large Left Gable 2 6114 Small Right Gable 2 6115 Small Left Gable 2...

Страница 24: ...On the rear gable use a bolt and nut at the overlapping rear wall angle 2 Fasten the single roof beam to the outer gable leg as shown using bolts Hint The holes along the length of the beam must be on the top surface RepeatStep1fortheoppositesideof building 3 Join the left and right gables together with a gable brace using a bolt in the second hole from the bottom only Do this step for both front ...

Страница 25: ... Roof Beam Brace 6227 STEP 2 Roof Beam Brace 6227 STEP 7 Main Roof Beam Assembly 4 Fasten the other end of the main roof beam to the gable brace of the rear gable 5 Fasten a roof beam brace to the mainroofbeambehindthefrontgable by placing the tab on the end of the bracebetween theroofbeams Align the tab with the second hole and fasten the brace with a bolt and nut 6 Fasten the lower end of the ro...

Страница 26: ... holes will align NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be installed 2Positiontherightroofpanelatthe back right corner and fasten to the gable with 7 bolts and nuts and roof beams using 2 screws Do not fasten the lower end of the panel to the side wall angle at this t...

Страница 27: ...y 27 8462 Right Roof Panel 1 8463 Left Roof Panel 2 5209 Roof Panel 2 6538 Roof Panel 2 2 Cut 28 short 3 8 cm strips off the roll of weather stripping tape and put them aside Cover the joint at the peak with weather stripping tape Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do not cut the tape at this time NOTE If roof beam holes do not line up wi...

Страница 28: ... strips of weather stripping tape and continue weather stripping the ridge 3 Fasten the lower end of the panels to the side wall angles using screws and washers Use bolts and nuts through wall angle overlaps at the bottom of the panel Reducing Large Gable Bulge Loosen eight bolts and nuts shown Apply pressure with one hand at the peak of the gable and tighten bolt 1 Keeping pressure on the gable w...

Страница 29: ...de roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw 4 Fasten the roof panel ribs peak caps and ridge caps together using bolts and nuts 8485 Left Side Roof Trim 2 8836 Right Side Roof Trim 2 Step 16 D29 Parts Needed For RoofTrim STEP 1 8836 STEP Peak Cap Roof Trim STEP 2 4 8485 8485...

Страница 30: ... screw 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Fasten to door above and below center connection using 2 screws 4 Insert a second bolt in the door handle and tighten both bolts 5 Put a horizontal door brace onto the top edge and bottom edge and fasten with 1 bolt in the cen...

Страница 31: ... the door slides 3 Fasten the door to the door slides usingtwo 10Bx1 2 13mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repeat steps 1 through 3 for the left door Keep this Owner s Manual and Assembly Instructions for future reference STEP 2 HorizontalDoorBrace STEP 1 Gable STEP 3 10Bx1 2 13 mm Screw DoorSlide Adjustmen...

Страница 32: ...l rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from being scraped by the screws 3 Keep roof base perimeter and d...

Отзывы: