background image

The Foundation For Your Building

9

FRONT

(DOOR)

FRONT

(DOOR)

Foundation

     A09

Note: Finished Slab dimensions, with lumber removed.

OPTION 1: ARROW FLOOR FRAME KIT:

 

(Order No. FB109-A or 68385-A)

Arrow has the best base for your building in this simple kit. It keeps stored items above the ground.  This kit should be used with one
of the following:
A. To support a plywood deck B.  To be filled with sand. We recommend the combined use of
1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.
Allow 1 - 2 hours for construction.

OPTION 2: Wood Platform

If you decide to build your own foundation, be sure to select the appropriate materials.
These are the recommended materials for your foundation:

 2 x 4's (5cm x 10cm) Pressure Treated Lumber 

 5/8" (1,5cm) 4 x 8 (122cm x 244cm) Plywood-exterior grade

 10 & 4 penny Galvanized Nails 

 Concrete Blocks (optional)

The platform should be level and flat (free of bumps, ridges etc.)
to provide good support for the building. The necessary materials
may be obtained from your local lumber yard.

To construct the foundation follow instructions and diagram.
Construct frame (using 10 penny galvanized nails)
Measure 16"/24" (40,6cm/61cm) sections to construct
inside frame (see diagram)
Secure plywood to frame (using 4 penny galvanized nails)

Allow 6 - 7 hours for construction.

OPTION 3: Concrete Slab

The slab should be at least 3" to 4" (8-10cm) thick. It must be level and flat to provide good support for the frame.
The following are the recommended materials for your foundation.

 1 x 4's (2,5cm x 10cm) (will be removed once the concrete cures)

 Concrete 

 Sheet of 6 mil plastic

 We recommend for a proper strength concrete to use a mix of:

 1 part cement 

 3 parts pea sized gravel 

 2 1/2 parts clean sand

Prepare the Site/Construct a Foundation
1. Dig a square, 6" (15cm) deep into the ground (remove grass).
2. Fill up to 4" (10cm) in the square with gravel and tamp firm.
3. Cover gravel with a sheet of 6 mil plastic.
4. Construct a wood frame using four planks of 1x4 (2,5cm x 10cm)
    lumber.
5. Pour in concrete to fill in the hole and the frame giving a
   total of 4" (8-10cm) thick concrete. Be sure surface is level.

Allow 3 - 5 hours for construction and a week for concrete curing time.

Note: Platform/Slab will extend 9/16" (1,4cm) beyond floor

 frame on all four sides. Seal this 9/16" of wood with a

 roofing cement (not included), or bevel this 9/16" of

concrete when pouring, for good water drainage.

121"

3,1m

16"/24"

40,6cm/61cm

92 3/4"

2,4m

121"

3,1m

92 3/4"

2,4m

Содержание PM108

Страница 1: ...EARGLOVES WHEN HANDLING METAL PARTS 704740101 Model No PM108 VM108 Owner s Manual Assembly Instructions G1 Exterior Dimensions Interior Dimensions Door Approx Foundation Storage Area Roof Edge to Roof...

Страница 2: ...the ground Available by mail order or at your local dealer or you may construct the foundation and anchoring system of your choice Your assembly instructions provide information on a few methods comm...

Страница 3: ...Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Mat...

Страница 4: ...trate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid...

Страница 5: ...icate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to protect against weather infiltration and to...

Страница 6: ...slab Each kit containsheavy duty hot dipped galvanized steel corner gussets and perimeter clips which fit over the floor frame and lag bolt into a concrete slab Full assembly instructions and a 1 4 m...

Страница 7: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 7...

Страница 8: ...THIS PAGE WAS LEFT BLANK INTENTIONALLY 8...

Страница 9: ...penny galvanized nails Measure 16 24 40 6cm 61cm sections to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails Allow 6 7 hours for construction OPTION 3 Concret...

Страница 10: ...it and installation instruction AnchoringintoConcrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1...

Страница 11: ...uide 4 66242 Door Slide 4 66183 Roof Trim Cap 2 right 2 left 66192 Peak Cap 1 66045 Handle 2 66646 Washer 198 6 sheets of 40 67468 Peak Cap 1 ArrowLogo 65004 8Ax5 16 Screw 304 65923 8 32x3 8 Bolt 153...

Страница 12: ...le 2 17 8578 Right Roof Panel 2 18 8579 Left Roof Panel 2 19 8583 Side Siding 6 Board 4 20 8584 Side Siding 5 Board 4 21 8585 Side Siding 3 Board 4 22 8736 Rear Siding 5 Board 2 23 8737 Front Siding 5...

Страница 13: ...13 Assembly by Key No G13...

Страница 14: ...he holes in these pieces will align when the pieces are positioned with cor rect amount of overlap See the illus trations below for the proper overall lengthofthesideandrearfloorframes Join the frames...

Страница 15: ...figure and fasten themtogetherwithoneboltandnutin the center hole 2 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with one bolt and nut in the...

Страница 16: ...h piece align Make four sets of roof beams by repeating this procedure Do not insert bolts yet 3 Take two of the pressed together roof beams and join them as shown toformthemainroofbeamassembly Hold t...

Страница 17: ...as shown 2 Insert four screws from the under side only Hint The holes in the top side of the doortrackassemblyareforfastening the gable to the top of the front wall in a later step 3Positiondoorslides...

Страница 18: ...rom the bottom with nuts on top 2 Measure the floor frame diago nally When the diagonal measure ments are equal the floor frame is square NOTE If using a wood platform or concrete slab do not fasten t...

Страница 19: ...ded For Posts Top Frames NOTE The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to com plete the asse...

Страница 20: ...2 Fasten side splice posts to the sidesofbuildinginthesamemanner Angled end of posts must be on top 3 Fasten the top of the door jambs to the door track with 2 screws Do the same for the bottom into...

Страница 21: ...randsplicepost Position stud inside top angle and fasten with a screw 2 Rest bottom tab large hole out side floor frame Do not fasten tab at this time Repeat procedure for the remaining studs around t...

Страница 22: ...oard to the top as before Remove and reuse screw in angle to fasten top siding 4 From inside building fasten siding to corner posts using screws 5 Repeatsteps1through4foroppo site side of building NOT...

Страница 23: ...from the inside using screws into post and jamb 4 Install front siding 3 board and front siding 6 board to complete both front sections 8736 Rear Siding 5 Board 2 5307 Rear Siding 3 Board 2 5306 Rear...

Страница 24: ...ece Carefully separate them before continuing 1 Attach the four roof beam brack ets to the gables using two bolts washers and nuts NOTE Mounting leg of bracket must face toward center of gable Step 11...

Страница 25: ...center gable leg 2 Join the left and right gables together with a gable brace using a bolt and nut in the second hole from the bottom only 3 Repeat Steps 1 2 for the door track on the front of buildin...

Страница 26: ...end of the main roof beam to the gable brace of the rear gable 4 Fasten the single roof beams small holes on top as shown using bolts and nuts 5 Fasten a roof beam brace to the mainroofbeambehindthefr...

Страница 27: ...nd holes will align NOTE If a Roof Beef Up Kit was purchased assemble prior to attaching the roof panels 1 Locate the roof panels by their numbers Note the sequence and position they are to be install...

Страница 28: ...RoofAssembly 28 8578 Right Roof Panel 1 8579 Left Roof Panel 2 7571 Roof Panel 2 7743 Roof Panel 2 8840 Ridge Cap 1 2 Cut 4 short 2 5cm strips off the roll of weather stripping tape and put them asid...

Страница 29: ...Roof Trim ArrowLogo Goes on Front of Building 3 STEP STEP 5 8836 6 3 Attach the right and left side roof trim to the lower end of the roof pan els on each side of the building using screws at each pan...

Страница 30: ...the door and insert a screw 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place Faste...

Страница 31: ...s in the door slides 3 Fasten the door to the door slides using a 10Bx1 2 screw NOTE The four holes in the top of each door allow you to adjust the doors Place the door slide in the middle 2 holes 4 R...

Страница 32: ...as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to pro tecting against weather infiltration the washers pro tect the metal from...

Отзывы: