Arrow Storage Products EH65-A Скачать руководство пользователя страница 16

Position 

front

 

corner panels 

at the 

corners of the fl oor frame as shown. 

The widest part of each corner panel 

must be placed at the front of the build-

ing. Fasten the corner panels to the 

fl oor frame with two screws.

Position 

rear corner panels 

at rear 

of building as shown. The widest part 

of each corner panel must be placed 

along side of the building. Fasten 

corner panels to the fl oor frame using 

four screws. 

NOTE

The wall panels come in two

widths. Each wall panel has a

crimped rib on one side. The

crimped rib should go under the

rib of the panel that follows it.

Attach 

 wall panels 

to the sides,  

as shown.

NOTE

Be careful to install the correct

panel in each position as shown.

The remainder of the building assembly 

requires many hours and more than one 

person. Do not continue beyond this 

point if you do not have enough time to 

complete the assembly today. A partially 

assembled building can be severely 

damaged by light winds.

NOTE

Each screw and bolt in the wall re-

quires a washer.

 Parts Needed For 

Corners/Wall Panels

Step 3

 9389 Front Corner Panel (2)

 9393 Rear Corner Panel (2)

 7332 Wall Panel (2)

Double-check the part numbers of 

the wall panels, before proceeding.

 

FRONT

STEP

TOP VIEW

9393

SIDE

REAR

Narrow

Side

9389

9389

SIDE

WideSide

9393

1

STEP

2

SUPPORT THE CORNER PANEL

WITH A STEP LADDER UNTIL A

WALL PANEL IS ATTACHED.

9393

7332

7332

9393

9389

9389

Panels rest on 

frame as shown

Crimped Rib

Underneath

Washer

STEP

3

O16

  The fl oor frame 

must be square

  and

 

level 

or holes will not align.

CORRECT

INCORRECT

16

Содержание EH65-A

Страница 1: ...5 cm 181 0 cm 137 8 cm 174 3 cm 81 3 cm 152 4 cm 709120611 Storage Area 27 Sq Ft 147 Cu Ft 2 5 m2 4 2 m3 BUILDING DIMENSIONS Size rounded off to the nearest foot CAUTION SOME PARTS HAVE SHARP EDGES CA...

Страница 2: ......

Страница 3: ...ow s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of your choice Your assembly instructions provide information on...

Страница 4: ...er possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Materials...

Страница 5: ...weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to avoid distractions an...

Страница 6: ...that prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to pr...

Страница 7: ...o a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus ve heavy duty...

Страница 8: ...Accessories SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re...

Страница 9: ...es etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny...

Страница 10: ...struction Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6 6...

Страница 11: ...Door Guide 4 66183 Roof Trim Cap 2 right 2 left 66045 Handle 2 66646 Washer 181 5 sheets of 40 65109 8 32 Acorn Nut 6 Packed with Screws 67468 Peak Cap 2 65004 8Ax5 16 8 mm Screw 176 65923 8 32x3 8 10...

Страница 12: ...4 9 6657 Door Handle Brace 2 10 6658 Gable Brace 2 11 6869 Ridge Cap 1 12 6515 Wall Panel Rear 2 13 10476 Right and Left Doors 2 14 7332 Wall Panel Side 2 15 9369 Door Jamb 2 16 9389 Front Corner Pane...

Страница 13: ...13 Assembly by Key No C13 5 6 7 11 6 10 3 4 19 7 12 12 5 14 17 10 18 3 4 8 8 16 16 15 15 9 9 8 8 25 24 13 23 24 14 21 23 17 1 2 13 20 22 22...

Страница 14: ...holes in the top side of the door track are for fastening the gable to the top of the front wall in a later step 1Positiondoorslidesontothelegs from the end of door track as shown in the end view 2 Se...

Страница 15: ...ing a wood platform or concrete slab do not fasten the oor frames to your base at this time You will anchor the building after it is erected Step 2 C15 Parts Needed For Floor Frame 9403 Front Floor Fr...

Страница 16: ...ch position as shown The remainder of the building assembly requires many hours and more than one person Do not continue beyond this point if you do not have enough time to complete the assembly today...

Страница 17: ...idewallanglesacross theinsidetopofthesidepanelsusing screws Sidewallanglesmustoverlap rear wall angle in corners 4 Fasten the side wall channels across the middle of the side panels usingscrews Fasten...

Страница 18: ...Panel 2 1 Fasten the wall panels at the top and bottom with screws 2 Fasten the center of each panel to the wall channel with screws Fasten overlapping ribs as before Panels rest on frame as shown 2...

Страница 19: ...Push a plug into hole at center of jamb closest to door opening 2 Fasten the top of the door jamb to the door track with two screws Do the same for the bottom into frame Repeatsteps1and2fortheopposit...

Страница 20: ...Steps 1 2 for the opposite side of building 5996 Right Gable 2 5997 Left Gable 2 6658 Gable Brace 2 Parts Needed For Gables Braces Step 7 The gables go on top of the front and rear walls to support th...

Страница 21: ...eroofbeam smallholes on top to the gable brace of the front gable 2 Fasten the other end of the roof beam to the gable brace of the rear gable 3 Fasten the roof angle to the roof beam as shown using s...

Страница 22: ...align Don t anchor the oor frame NOTE If a Roof Beef Up Kit was purchased assemble prior to at taching the roof panels 1 Locate the roof panels by their numbers and place them on the ground alongside...

Страница 23: ...6443 Left Roof Panel 1 Parts Needed For Left Roof Panel Step 10 1 Install a left roof panel 6443 at the left rear corner of the roof 6443 STEP 1 FRONT C23 23...

Страница 24: ...ft and right roof panel inthesequenceandpositionsshown in Step 9 Follow fastener sequence and instructions in Steps 9 thru 11 while fastening roof panels Fasten overlap at center of roof panel rib usi...

Страница 25: ...bottom angeoftheside roof trim at the corner inward enough so the right and left roof trim caps t onto right and left corners 5 Fasten the roof trim caps to the side trim using a screw Step 12 6869 Ri...

Страница 26: ...as shown Don t tighten the bolt yet 2 Swing the door handle brace up to the hole on the opposite side of the door and insert a bolt and nut 3 Insert a second bolt in the door handle and tighten both b...

Страница 27: ...ssembly 1 Left Door Assembly 1 Parts Needed For Door Installation Adjustment 1 From inside the building put the bottom of the right door assembly on your left when you are inside the building behind d...

Страница 28: ...tions can help to stop rust from developing or stop it quickly as soon as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to protec...

Отзывы: