background image

6

Q.

 What if the rear wall angle and channels are too large to fi t inside of the rear wall panels?

A.

  Check  the  dimensions  of  wall  assemblies.  They  should  be  slightly  smaller  than  the  fl oor  frames.  Lay  the 

assemblies on top of the rear fl oor frame and pull them up to the top of the wall panels causing the corner panels 

to stand erect and not lean inward. Caution: Be careful to not scratch the panels on the way up.

Q.

 The wide rib always overlaps the crimped rib. Is there ever an exception?

A.

 This sequence is to be followed through the assembly process. However, this will typically happen once on the 

rear and once on each side wall (vertical wall units only) where there will be either two crimped ribs overlapping or 

two wide ribs overlapping. This may give it a tighter fi t, but it will work.

Q.

 Can the building be painted?

A.

 The buildings can be painted with an exterior-grade paint designed for use on steel. Contact your local paint 

supplier for recommendations.

Q.

 I heard that rust might be an issue with steel; is it?

A.

 While steel can rust, with proper care this should not be an issue. For a long-lasting fi nish, periodically clean 

the exterior surface and apply spray-on car wax. Touch up scratches as soon as you notice them by immediately 

cleaning the area with a wire brush or emery paper, washing it and applying touch-up paint. This will minimize rust 

and maintain your shed’s attractive appearance for years. 

Q.

 How do I take care of dents in my shed?

A.

 Proper selection of shed size, including a suffi cient door-opening width, and proper placement of your shed 

should minimize the possibility of damage. If a dent does occur, carefully push the dent out from the opposite side. 

If the paint has been scratched or removed, touch up the area as soon as you notice it. Immediately clean the area 

with a wire brush or emery paper, wash it and apply touch-up paint. This will minimize rust and maintain your shed’s 

attractive appearance for years.

Still have questions? Visit us online at www.arrowsheds.com to view lots of helpful tips and information 

regarding all of our available products. You can also contact our Customer Service team at 1-800-851-1085 

(press 1), or via e-mail at [email protected].

06A

At the top of each page you will see one or more 

Part 

Cues

 like the one to the left. These 

Part Cues

 are 

designed to help you quickly identify the parts needed 

for each step.

#####

5

Part No.

Quantity Needed

End View

Part Name

Part Name

Confi rm that all hardware and parts are 

present before attempting to assemble 

your building.

Customer Service:

1-800-851-1085             or

[email protected]

For missing or damaged parts contact 

Customer Service. Do not return to store.

Part Numbers

Part Number

1. Each part has an identifying part number on it.

2. Part Numbers are referenced in each step.

3. Unpainted parts have a stamped in number and painted

     parts have a number that is inked on.

Remove inked on numbers with soap and water after assembly.

Содержание ED102

Страница 1: ...off to the nearest foot Exterior Dimensions Roof Edge to Roof Edge Width Depth Height Interior Dimensions Wall to Wall Width Depth Height Door Opening Width Height Approx Size Storage Area 10 x 2 21 S...

Страница 2: ...in altre lingue disponibile online Per accedere effettua la scansione del codice QR in basso PT Manual de montagem dispon vel em outros idiomas online Digitalize o c digo QR abaixo para obter acesso...

Страница 3: ...f of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Do NOT attempt to assemble your building on a windy day The large panels can catch t...

Страница 4: ...windy day Be careful on wet or muddy ground Use Teamwork Two or more people are required to assemble your building One person can hold the parts or panels in place while the other person fastens them...

Страница 5: ...your base and placing weights such as patio blocks or sandbags on the oor frame Failure to anchor the building if you leave it while partially assembled could result in irreparable damage or personal...

Страница 6: ...s square Also try loosening the roof beams to give more play and exibility Non alignment can also occur if your building is not level You can raise corners and shim under them to make it level Check t...

Страница 7: ...your shed s attractive appearance for years Q How do I take care of dents in my shed A Proper selection of shed size including a suf cient door opening width and proper placement of your shed should...

Страница 8: ...storage unit In each step you will see the abbreviations listed below used in the illustrations to help you identify which fastener to use Key Part Part Qty No No Description List 1 65103 Hex Nut 8 32...

Страница 9: ...1 9 6637 Side Wall Angle 2 10 9338 Right Rear Wall Angle 1 11 9339 Left Rear Wall Angle 1 12 7311 Door Jamb 2 13 9344 Siding Stud 2 14 8737 Front Siding 6 15 8827 Side Siding 6 16 8736 Rear Siding 6 1...

Страница 10: ...KEY NO 9 09DG 1 2 5 4 5 4 3 3 9 9 1 13 11 10 7 7 6 5 12 8 12 13 5 14 14 14 14 14 14 15 15 15 15 15 15 16 16 16 16 16 16 17 17 18 18 19 19 20 20 20 21 21 22 22 23 24 24 25 25 25 25 27 27 29 29 29 29 20...

Страница 11: ...VIEW Build the Floor Frame Install Corner Post Door Track Side Wall Angles and Rear Wall Angle Install Splice Post and Door Jambs Install Siding Studs Install Rear Siding Panels Install Side Siding Pa...

Страница 12: ...ASSEMBLY OVERVIEW Install Front Siding Panels Install Right and Left Gables Install Roof Beams Install Roof Panels Install Ridge Cap Side Trim and Corner Cap Install Doors 11AE Shed is now complete 11...

Страница 13: ...ions to construct inside frame see diagram Secure plywood to frame using 4 penny galvanized nails OPTION 3 Concrete Slab The slab should be at least 4 10 2 cm thick It must be level and at to provide...

Страница 14: ...NUING Finished Length 119 3 8 303 2 cm FRONT 9367 8934 9367 Four 4 Screws per side Overlap the Ramp and two 2 Front Floor Frames so that four 4 holes align at each end as shown Insert four 4 Small Scr...

Страница 15: ...hru Top You will need for this page Step 1 Floor Frames Overlap two 2 Rear Floor Frames as shown and secure with ve 5 bolts Two 2 bolts must enter from bottom 3 4 Check that the nished length of the A...

Страница 16: ...the Right and Left Rear Wall Angles as shown and secure using one 1 Small Bolt and Nut through the center hole 1 2 Check that the nished length of the Assembly is 118 1 8 300 0 cm Set aside for use i...

Страница 17: ...the corner back into position Slides should be installed in Door Track prior to installation However if this step is overlooked or if the Slides need to be removed for maintenance the following proced...

Страница 18: ...at each corner as shown At the front corners insert one 1 Small Bolt and Nut through the bottom of the Frame as shown 1 Do not continue beyond this point unless you have enough time to complete the s...

Страница 19: ...ep 5 Posts Top Frames 5288 5288 5288 5288 SIDE SIDE REAR FRONT TOP VIEW 6637 6637 Front Rear Wall Angle Assembly Door Track Assembly Short Leg on Bottom Opening Faces In Long Leg on Top SS Position Co...

Страница 20: ...one 1 Small Screw at the lower hole 2 Place bottom of Stud Assembly over Floor Frame as shown Do not fasten bottom at this time Repeat procedure for the remaining Stud Assemblies around the building 3...

Страница 21: ...use on every Screw and Bolt Step 7 Side Siding Place Front Wall Channel into position behind Corner Posts and Door Jamb Fasten using Six 6 Small Screws 1 Slide Side Siding into channels of Corner Post...

Страница 22: ...w and Bolt SS Slide bottom Rear Siding Panels into channels of Corner Posts and Splice Post as shown Once in place secure with two 2 Small Screws per Panel Screw going into bottom Floor Frame also sec...

Страница 23: ...ompletely overlapped or holes will not line up 8737 Front Siding 6 8737 8737 8737 8737 8737 8737 Slide Front Siding into channels of Corner Posts and Door Jambs as shown Once in place secure Panels fr...

Страница 24: ...DURING SHIPPING AND MAY BE MISTAKEN FOR ONE GABLE SEPARATE GABLES BEFORE CONTINUING 23 Leg of Roof Beam Bracket must face center of Gable as shown 6000 6001 5971 5971 6001 5971 Step 10 Gables Apply E...

Страница 25: ...Gables to the Rear Wall Angle with eight 8 Small Screws 3 5 To secure Gables together position the Gable Brace as shown and insert one 1 Small Bolts and Nuts through the bottom hole 4 Insert two 2 Sma...

Страница 26: ...es closest to the peak of each Gable These will be used to attach the Track Support later 6 7 To secure Gables together position the Gable Brace and Track Supports as shown Secure Track Supports to Ga...

Страница 27: ...page Step 11 Roof Framing Beam End Views Angled side of Beams must face up 1 Position the Roof Beams as shown below and install using two 2 Small Bolts and Nuts per side Install the Main center Beams...

Страница 28: ...eft to right If this does not help your building may not be level Shim the corners until holes line up Roof Install Prep Page Use the information on this page to complete step 12 The building is squar...

Страница 29: ...4 Step 12 Roof Assembly 1 Using Weather Stripping Tape seal roof ridge 2 28DG 6543 6543 28 SS SB SB SB SB SB SB SB SB SB SB SB Following the diagram on the previous page attach Roof Panel to center ro...

Страница 30: ...f Trim 2 67468 Peak Cap 2 QTY 4 SS QTY 4 SB SS SS SS SS SB SB 66183 66183 66183 66183 6014 6014 6868 67468 67468 Step 13 Ridge Cap Roof Trim 1 2 2 Install Peak Caps and Ridge Cap using four 4 Small Bo...

Страница 31: ...ree 3 screws Handle 1 You will need for this page Step 14 Door Assembly Attach the Door Handle and Door Handle Brace to the Door with two 2 bolts and nuts as shown Do not fully tighten the bolts that...

Страница 32: ...page Step 14 Door Assembly QTY 6 Door Guide 2 Horiz Brace 2 10497 Slide Horizontal Brace over Door edge and secure with one 1 bolt and nut in top and bottom 3 4 Secure the Door Guides and Lower Horizo...

Страница 33: ...ront Floor Frame track at about the half open position 1 Rotate the Door forward until it is vertical and align the Door Slides with the Door 2 Insert two 2 Black Screws into each Door Slide as shown...

Страница 34: ...mmended for use with any suggested base Contains 4 Anchors with Cable Clamps and installation instructions Anchoring into Wood Post Use 1 4 6 mm Wood Screws There are 1 4 6 mm dia holes provided in th...

Страница 35: ...t does appear on your shed we recommend treating those areas as soon as possible following the paint supplier of your choice instructions Our customer service department can provide the paint tinting...

Страница 36: ......

Отзывы: