Arrow Storage Products DK1014 B1 Скачать руководство пользователя страница 33

   

Step 20

SQ33 ctr

 Parts Needed For 

Door Installation & Adjustment

 Right Door Assembly (1)

 Left Door Assembly (1)

From inside the building, put the 

bottom of the right door assembly 

(on your left when you are inside the 

building) behind door jamb into the 

front frame track.

Position the top of the door so that 

the holes in the door line up with the 

holes in the door slides.

Fasten the door to the door slides 

using two #10Bx1/2" (13 mm) screws 

per door slide.

NOTE

The holes in the door slides allow 

you to adjust the doors. Place the 

door in the middle holes.

Repeat steps 1 through 3 for the 

left door.

STEP

2

Horizontal Door Brace

STEP

1

Gable

STEP

3

#10Bx1/2" (13 mm)

      Screw

Door Slide

Adjustment Holes

Adjustment Holes Allow

Doors to Meet Evenly

Along Their Length

Right Door

Left Door

STEP

4

Front Floor Frame Assembly

Door Track

Door Slide

D

oor

Keep this Owner's Manual and Assembly Instructions for future reference.

(8)

33

Содержание DK1014 B1

Страница 1: ...7 3 cm x 407 0 cm 313 1 cm 413 4 cm 223 2 cm 300 4 cm 400 1 cm 220 0 cm 141 0 cm 152 4 cm Owner s Manual Assembly Instructions 715830520 Storage Area 129 Sq Ft 852 Cu Ft 12 0 m2 24 1 m3 BUILDING DIMEN...

Страница 2: ......

Страница 3: ...our building to the ground Available at your local dealer Arrow s website arrowsheds com or call Arrow s Customer Service department 1 800 851 1085 or you may construct a base and anchoring system of...

Страница 4: ...k Whenever possible two or more people should work together to assemble your building One person can position parts or panels while the other is able to handle the fasteners and the tools Tools and Ma...

Страница 5: ...oncentrate your total weight on the roof of the building When using a step ladder make sure that it is fully open and on even ground before climbing on it Keep children and pets away from worksite to...

Страница 6: ...hat prevent them from sliding easily Lubricate door track annually with furniture polish or silicone spray Keep doors closed and locked to prevent wind damage Fasteners Use all washers supplied to pro...

Страница 7: ...to a concrete slab Full assembly instructions and a 1 4 masonary drill bit are included TOOL HANGING RACK Model No TH100 The perfect tool organizer Twin 25 1 2 64 8 cm steel channels plus five heavy d...

Страница 8: ...Accessories SPECIAL NOTE If your accessory is shipped via truck line a day time phone number is required to arrange delivery If no one is available to sign for the delivery you may be subject to a re...

Страница 9: ...etc to provide good support for the building The necessary materials may be obtained from your local lumber yard To construct the base follow instructions and diagram Construct frame using 10 penny g...

Страница 10: ...nstruction Anchoring into Concrete 1 For poured concrete slab or footing or patio blocks Use 1 4 x 2 6 mm x 51 mm Lag Screws 2 For Anchor Post of Concrete poured after building is erected Use 1 4 x 6...

Страница 11: ...66045 Handle 2 66646 Washer 601 16 sheets of 40 65109 8 32 Acorn Nut 4 Packed with Screws 67468 Peak Cap 6 Arrow Logo 65004 8Ax5 16 8 mm Screw 506 65923 8 32x3 8 10 mm Bolt 260 65900A 10Bx1 2 13 mm Bl...

Страница 12: ...9 Door Jamb 2 16 67521 Edge Trim Clear 2 17 6015 Side Roof Trim 2 18 6403 Door Track Splice 1 19 6797 Ridge Cap 6 20 6869 Ridge Cap 3 21 11498 Right Side Roof Trim 2 22 80257 Left Side Roof Trim 2 23...

Страница 13: ...37 37 16 16 28 28 6 6 19 19 20 29 29 30 30 31 31 3 3 3 3 12 12 12 12 12 26 26 2 2 27 27 35 35 36 10 10 14 14 15 15 11 11 1 1 10 10 18 32 32 32 32 12 25 34 34 34 24 34 33 33 23 23 26 25 26 30 30 30 30...

Страница 14: ...ieces will align when the pieces are positioned with correct amount of overlap See the illustrations below for the proper over all length of the side and rear floor frames Join the frames by inserting...

Страница 15: ...h one bolt in the center hole 4 Make two side wall angles by overlapping the side wall angle pieces as shown Fasten each set together with one bolt thru the second large hole from the end of each part...

Страница 16: ...two of the pressed together roof beams and join them as shown to form the main roof beam assem bly Hold the assembly together and fasten with 14 bolts Build only one Doubled Beam Assembly 3 Fasten th...

Страница 17: ...e underside only Hint The holes in the top side of the door track assembly are for fastening the gable to the top of the front wall in a later step 3 Position door slides onto the legs from the end of...

Страница 18: ...the front corners fasten bolts through from the bottom with nuts on top 2 Measure the floor frame diagonally When the diagonal measurements are equal the floor frame is square NOTE If using a wood pla...

Страница 19: ...shown 6515 Wall Panel 2 9373 Front Wall Panel 2 8470 Corner Panel 4 10563 Wall Panel 4 Step 6 SO19a ctr Parts Needed For Corners NOTE The remainder of the building assembly requires many hours and mo...

Страница 20: ...en the rear wall channel across the middle of the rear wall using screws 2 Fasten the side wall channels across the middle of the side panels using screws Fasten overlaps in rear corners with bolts an...

Страница 21: ...across the inside top of the rear wall using screws 2 Fasten the side wall angles across the inside top of the side panels us ing screws Side wall angles must overlap rear wall angle in corners 3 Fast...

Страница 22: ...ding 2 Fasten the wall panels at the top and bottom with screws 3 Fasten the center of each panel to the wall channel with screws 4 Fasten overlapping ribs as before STEP 1 3 STEP 4 STEP 6515 Bolt and...

Страница 23: ...time 2 Fasten a door jamb to the front panel with two bolts nuts and acorn nuts as shown 3 Fasten the center of the door jamb to the front wall panel and the front wall channel with two screws 4 Faste...

Страница 24: ...uts on each side This part of the gable is called the outer gable leg 4 Attach the four roof beam brackets to the outer gable legs using two bolts in the two bottom holes of the four holes that align...

Страница 25: ...a bolt and nut at the overlapping rear wall angle 2 Fasten the single roof beam to the outer gable leg as shown using bolts Hint The holes along the length of the beam must be on the top surface Repea...

Страница 26: ...oof Beam Brace 6227 STEP 7 11499 Roof Beam Double 4 Fasten the other end of the double roof beam to the gable brace of the rear gable 5 Fasten a roof beam brace to the double roof beam behind the fron...

Страница 27: ...els 1 Locate the roof panels and find the right roof panel part number 8462 2Positionarightroofpanelattheback right corner and fasten to the top roof beam using a screw 3Removeedgetrimfromtheleftgable...

Страница 28: ...l Unroll the tape and press it down over the opening at the ridge as you install each roof panel Do not cut the tape at this time 5 Install three ridge caps 6797 on the completed roof section using bo...

Страница 29: ...move the ridge cap to the side and overlap the ribs of the next roof panel 3 Install two roof panels 6538 as before working side to side while fastening down ridge caps NOTE If roof beam holes do not...

Страница 30: ...tape and press it down There are 6 bolts at the overlap of 8462 11504and8463 11504thatneed astripoftapeoverthempriortocover ingwiththeridgecap Fastenthelower endofthepanelstothesidewallangles using s...

Страница 31: ...ebottomflangeoftheside roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners 3 Fasten the roof trim caps to the side trim using a screw 80257 Left...

Страница 32: ...r of the door and insert a screw 3 Hold the vertical door brace against the center of the inside sur face of the door and turn the screw to hold the vertical door brace and door handle brace in place...

Страница 33: ...oor slides 3 Fasten the door to the door slides using two 10Bx1 2 13 mm screws per door slide NOTE The holes in the door slides allow you to adjust the doors Place the door in the middle holes 4 Repea...

Страница 34: ...Anchoring Anchor your building at this time Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time Anchoring and Floor Frame XA34...

Страница 35: ...as it appears 1 Avoid nicking or scraping the coating surface inside and out 2 Use all the washers supplied In addition to protecting against weather infiltration the washers protect the metal from b...

Страница 36: ...715830520 CM36a DK1014 B1 LX1014 C1 SG1014FB...

Отзывы: