
PP10A-XXX-XXX-A (en)
Page 7 of 12
1
144
126
69
180
131
27
175
70
144
175
70
181
22
208
250
63
60
21
68
74
26
255
195
9
14
15
29
7
6
5
63
61
19
33
22
21
19
33
TORQUE REQUIREMENTS
NOTE: DO NOT OVERTIGHTEN FASTENERS.
(14) diaphragm bolt, 25 - 30 ft lbs (33.8 - 40.6 Nm).
(26) screws, 20 - 25 ft lbs (27.1 - 33.8 Nm).
(29) Nut, 15 - 20 ft lbs (20.3 - 27.1 Nm).
(131) screws, 12 - 17 ft lbs (16.2 - 23.04 Nm).
LUBRICATION / SEALANTS
Apply PTFE tape to threads.
Apply Loctite® 242® to threads at assembly.
Apply Loctite 271™ to threads at assembly.
Apply Lubriplate FML-2 grease (94276) to all “O” rings, “U” cups
and mating parts.
Apply anti-seize compound to threads and bolt and nut flange
heads which contact pump case when using stainless steel fasteners.
PARTS LIST / PP10A-XXX-XXX-A FLUID SECTION
FOR THE AIR MOTOR SECTION,
SEE PAGES 8 AND 9.
Figure 4
Torque Sequence
5
3
2
7
9
1
10
8
6
4
RELEASED 20/Feb/2019 12:56:22 GMT