Standard Equipment Layout

Supply Air

Fresh Air

Dumpback

Damper

Forklift Supports/ 

Lifting Points

Lifting 

Points

D

X Coil

Fil

ters

Condensor 

Fan

8               OAP – Outside Air Package Units Installation and Operation Manual 2021   

Содержание 0AP900

Страница 1: ...Installation and Operation Manual OAP Outside Air Package Units 0AP900 OAP10000 M ADE A U STRALI A N Manufactured byArmcor M ADE A U STRALI A N Manufactured byArmcor...

Страница 2: ...equirements Mains Power Supply and Fusing Standard Equipment Layout 8 Features 9 General Maintenance 11 General Monthly Maintenance Schedules Guide to How Frequency According to Usage is Established T...

Страница 3: ...c Please contact our engineering team about your project to ensure the correct application of the OAP units The OAP unit can be provided with fixed speed compressors digital scroll or inverter compre...

Страница 4: ...vice heat recovery and or air handling equipment Installing and servicing equipment can be hazardous due to electrical and mechanical components When working on equipment observe precautions in all li...

Страница 5: ...d to the supply and return ducts to reduce any vibration transfer Fresh Air Inlet The location of the fresh air inlets must adhere to the Australian Standards AS 1668 2 The fresh air intake should be...

Страница 6: ...y codes and guidelines Wear safety goggles work gloves work boots and protective clothing All external units are provided with substantial lifting lugs on each corner at the base frame NOTE All units...

Страница 7: ...n commissioning Where a Heat Exchanger is incorporated in the equipment warranty will be void if filters are not fitted IMPORTANT NEVER OPERATE A UNIT WITHOUT FILTERS FITTED TO THE FRESH AIR INTAKE El...

Страница 8: ...rd Equipment Layout Supply Air Fresh Air Dumpback Damper Forklift Supports Lifting Points Lifting Points DX Coil Filters Condensor Fan 8 OAP Outside Air Package Units Installation and Operation Manual...

Страница 9: ...ring operation after the unit has stabilised Compressor Control Board TX Valve All TX valves have adjustment for super heat settings 8 11K is acceptable for R407C and R410A gases OAP Outside Air Packa...

Страница 10: ...for transport and for the operation of the compressor Electrical Connection Tighten all electrical connections before starting and commissioning unit Phase Failure Relay Fan Control Card Adjust pots...

Страница 11: ...eck condensate drain if applicable for free drainage Guide to How Frequency According to Usage is Established Disposable Corrugated Filters Ordinary disposable corrugated filters should last approxima...

Страница 12: ...The original service call costs in identifying a warranty claim Freight and travel changes for work performed or parts supplied outside of all capital cities in Australia Field wiring refrigerant pip...

Страница 13: ...t during transport Leak test all caps and screwed connections after commissioning Starting Unit Check fans and Air Flow Turn on all circuit breakers Turn on control circuit and activate fans Turn on s...

Страница 14: ...Motor Amps Indoor Fan Motor Amps Boost Heater Element Amps Total Unit Amps Thermostat Settings C Thermostat Operating Correctly Y N Contactors Relays Operating Correctly Y N All Terminals Checked for...

Страница 15: ...Commissioning Checklist Performance 1 Fresh Air Temperature C DB C WB 2 Supply Air Temperature C DB C WB Notes OAP Outside Air Package Units Installation and Operation Manual 2021 15...

Страница 16: ...au P 03 8301 9200 109 111 Northcorp Blvd Broadmeadows Vic 3047 2021 Armcor Air Solutions reserves the right to alter products and specifications without notice and does not accept responsibility for p...