EC142 Gate Installation
Quick Start Guide Rev002
Customer Support
1 800 371 0735
A Division Of Countermeasures Security Solutions Inc.
Page | 16
8. ARMA Gate Leveling
8.1. Center the Gate between the Main Gate Post and Counterbalance Post and place a level on
the Top Rail. The level should be midway between the two Posts.
8.2. Adjust
the 5/8” Regular Hex Head Nut and Hex Head Lock Nut on the Bearing Truck shaft
until the gate is level.
8.3. For larger adjustments, loosen off U-
Bolt 1/2” Hex Nuts and raise or lower the Bearing Truck
Bracket by striking it with a mallet to desired height then retighten nuts. (See Step 2 above)
8.4. Comp
lete any fine tuning by adjusting 5/8” Regular Hex Head Nut and Hex Head Lock Nut on
Bearing Truck shaft.