background image

 
 

5)

 

Assemble

 

the

 

three

 

pieces

 

of

 

Header

 

on

 

the

 

floor

 

(like

 

previously

 

on

 

the

 

Curb)

 

using

 

the

 

ZH135

 

135

 

degree

 

Header

 

Bracket

 

(#20)

 

and

 

the

 

#8X1/4”

 

Header

 

Curb

 

Bracket

 

Screws

 

(#21).

 

As

 

the

 

headers

 

are

 

lying

 

open

 

end

 

down,

 

place

 

the

 

ZH135

 

clips

 

onto

 

the

 

corners

 

and

 

align

 

the

 

mi

ters,

 

Header

 

Bracket,

 

and

 

holes.

 

Fasten

 

the

 

cor

ners

 

together

 

with

 

the

 

#8x1/4”

 

screws

 

(refer

 

to

 

(B)

.

 

Now

 

place

 

the

 

assembled

 

header

 

pieces

 

over

 

and

 

down

 

onto

 

the

 

vertical

 

posts.

 

Attach

 

the

 

Header

 

to

 

the

 

Wall

 

Jambs

 

and

 

135°

 

Post

 

from

 

the

 

inside

 

using

 

a

 

1/8”

 

drill

 

bit

 

to

 

drill

 

through

 

the

 

header

 

and

 

into

 

the

 

wall

 

jambs

 

and

 

135°

 

Post

 

being

 

extremely

 

careful

 

not

 

to

 

drill

 

into

 

the

 

glass.

 

Secure

 

with

 

the

 

#6X3/8”

 

screws

 

(#16)

 

(H)

.

 

Insert

 

the

 

ZV909

 

Wedge

 

Vinyl

 

(#18)

 

into

 

the

 

jambs

 

on

 

both

 

sides

 

of

 

the

 

glass.

 

A

 

block

 

of

 

wood

 

will

 

help

 

push

 

the

 

vinyl

 

in.

 

Slight

ly

 

wet

 

the

 

vinyl

 

with

 

water

 

to

 

ease

 

install.

 

The

 

flat

 

side

 

goes

 

against

 

the

 

glass.

 

Notice

 

the

 

groove

 

that

 

will

 

lock

 

in

 

to

 

the

 

edge

 

of

 

the

 

wall

 

jamb

 

(I)

.

   

Insert

 

the

 

ZV906

 

Horizontal

 

Wedge

 

Vinyl

 

into

 

the

 

header

 

and

 

curb

 

(#17)

 

in

 

between

 

the

 

metal

 

and

 

glass

 

without

 

stretching

 

it,

 

both

 

inside

 

and

 

out,

 

top

 

and

 

bottom.

 

Notice

 

the

 

lock

ing

 

groove

 

(J)

.

 

Repeat

 

the

 

procedure

 

for

 

the

 

other

 

panel.

                              

 

 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Содержание FD-NEO

Страница 1: ...8 3 ...

Страница 2: ...an up Glass Cleaner and Paper Towels Rubber Mallet File Arizona Corporate Office 2801 W Indian School Rd Phoenix AZ 85017 800 255 1901 PH 602 447 8208 FAX Florida 8100 1 Westside Industrial Dr Jacksonville FL 32219 855 695 8899 PH 904 786 9025 FAX Illinois 2601 Bond St 1 University Park IL 60484 800 861 6120 PH 708 235 0729 FAX Oregon 2057 Lars Way Medford OR 97501 866 773 7905 PH 541 773 7909 FAX...

Страница 3: ...he corners and align the miters Header bracket and holes Fasten the corners together with the 8x1 4 screws and then place the as sembled Curb in the centerline position on the shower curb B Make sure to fill the corners where the screws were inserted and the ends with silicone so as to seal any gaps that might leak C Installation Instructions for Model FD NEO Note These instructions will refer to ...

Страница 4: ...02 13 into each Curb that will hold a glass panel Insert the Glass into the ZSS 2101 Curb and the ZD 1006 Wall Jamb Set your ZSS 1105 135 Degree Post 19 down into the curb and over the edge of the glass Repeat the procedure for the other panel F Note It would be helpful to have and assistant to hold the ZSS 1105 Corner Post until the ZSS 2101 header is in place 4 Plumb the Corner posts Place the c...

Страница 5: ...m the inside using a 1 8 drill bit to drill through the header and into the wall jambs and 135 Post being extremely careful not to drill into the glass Secure with the 6X3 8 screws 16 H Insert the ZV909 Wedge Vinyl 18 into the jambs on both sides of the glass A block of wood will help push the vinyl in Slight ly wet the vinyl with water to ease install The flat side goes against the glass Notice t...

Страница 6: ...nt Note It will be helpful to have an assistant at this point to adjust and hold the door in place from the outside while you drill and fasten the latch jamb and the hinge jamb from the inside L Square up the door and align the edge of the door glass parallel with the latch jamb leaving a 1 8 gap between the two You want the edge of the door glass to overlap the latch jamb vinyl to edge of where i...

Страница 7: ... gap from the ZSS 1102 and the vinyl sweep Press on then secure by drilling holes through the sweep and into the bottom door rail Use 6X3 8 screws to secure Note the glass sits down into the bottom rail appx 3 8 so be careful not to drill into the glass O 10 Run a bead of silicone on the gap between the metal and the shower surface inside and out around the entire unit Fill all joints and gaps whe...

Отзывы: