background image

19

 

NOTES

Содержание VEDO

Страница 1: ...INSTALLATION OPERATION AND MAINTENANCE Ariterm Vedo ...

Страница 2: ...4 5 Laddomat 21 Connection diagram 6 Temperature control valve 7 About burning wood 8 Operation 9 11 Service and maintenance 12 15 Measurements and connections 16 Technical data 17 Guarantee 17 Declaration of conformation 18 Notes 19 23 ...

Страница 3: ...f the boiler in a afterburning chamber which is made of fireproof material The boiler does not have its own water tank as it must be connected to a warm water accumulator to operate pro perly Instead the boiler has a cooling spiral on which a temperataure control valve is installed to prevent overheating It also has an exhaust fan that enables even combustion and there is no height requirement for...

Страница 4: ...on paste If the flue is made of bricks use the supplied square elbow to connect the boiler Flue requirements Minimum Ø 140 mm and for a masonry flue free cross sectional area of at least 200 cm If an oil burner is used as well the flue requirement is a brick flue lined with acid proof thin walled pipe tube or an acid proof flue element The free surface area of the combus tion air opening must be 1...

Страница 5: ...stem is used membrane expansion vessel Filling the system Before heat is turned on the storage tank and heating system must be filled with water Instructions for filling Open all shutter valves including the four way mixing valve The pump must be switched off Fill in the heating system Remove air through the accumulator and radiators When the system is filled you can switch on the circulation pump...

Страница 6: ...sor Radiator temperature sensor Filling Radiator Radiator pump Shunt valve Connection to boiler top Ball check valve 1 IG Internal thermal valve Internal pump Wilo RS 25 6 3 Thermometer Connection to accumulator tank bottom Automatic cycle valve in case of power cut Easy to clean dirt pocket to prevent operating errors Connection to boiler bottom Thermometer Filling connection R15 Ball check valve...

Страница 7: ...ontrol valve to wood fired boiler with a cooling spi ral The Pressure Equipment Directive requires that manually filled wood fired boilers must be equipped with a safety device which prevents the boiler from overheating We recommend the SYR 3065 temperature control valve for this boiler This does not however replace other safety devices such as a pressure relief valve Installation The temperature ...

Страница 8: ...ater content of wood by weighing it Cut a test piece from freshly cut wood It is fit for combustion when its weight has decreased by about 60 If the fresh piece of wood weighs 1 000 g it is fit for combustion when it weighs 400 g Burning Wood is an organic material Its combustible constituents are carbon and hydrogen When wood heats up these constituents are released and gasify If the burning proc...

Страница 9: ...sely populated neighbour hoods It has been tested and approved in accordance with the latest wood fired boiler requi rements The approval requires both ceramic grates and transfer of heat into an accumulator Ariterm Vedo is a reverse combustion boiler in which combustion occurs downwards through the ceramic grate ...

Страница 10: ...small firewood enough to cover the bottom of the chamber Apply kindling on top of the wood Start a fire Close the feeding hatch When the fire is properly burning and a layer of charcoal has formed fill the firebox up no higher than to the top of the air vents After the fire is going well adjust the secondary air vent approximately to position 2 Flue gas temperature should be 150 180 C Adjust prima...

Страница 11: ...mpatible with an KMP PX21 pellet burner Replace the stoking hatch with a hatch with an PX21 pellet stoker If you use a pellet burner remove the ceramic grates and se condary combustion chamber and close primary and secondary air vents Specified instructions on the installation and use of the pellet burner come with the burner Oil use Ariterm Vedo is also compatible with using oil as fuel The oil b...

Страница 12: ... the convector after the flue gas temperature has risen by 30 C from clean boiler value or the draft has weakened The boiler will function properly and have a long service life when the following matters are ta ken care of The boiler should be located in a dry space The boiler should always be operated within the recommended limits The boiler should be cleaned up when the flue gas temperature has ...

Страница 13: ...e that the fire door damper opens and closes as you use the feeding hatch Make sure that the fire door damper closes when you close the feeding hatch Remove all turbulators Clean the boiler convector by brushing the convector pipes clean ...

Страница 14: ...fee ding hatch will cause wood to combust in the wrong place Tighten the hatches by adjusting the lock handle and hinge pieces The tightness of the hatches is important for the proper functioning of the boiler Adjusting the lock handle Unscrew the screw of the lock handle enough to be able to turn the eccentric sleeve in the hole Turn the sleeve to make the handle move away from the boiler Tighten...

Страница 15: ...direc tion of the boiler Tighten the mounting screws slightly and test whether the hatch now sits more tightly on the hinge side Once the hatch is sitting properly tighten all the screws If the adjustment tolerance on the hatch runs out its seal will have to be replaced Adjusting the hinge SERVICE AND MAINTENANCE ...

Страница 16: ...8 Outlet to accumulator DN 32 9 Expansion vessel outlet DN 25 10 Cooling spiral Cu 15 11 Return from accumulator DN 32 12 Draining outlet DN 15 13 Water thermometer pressure gauge 14 Flue connection 15 Flue gas fan 16 Control valve DN 15 17 Horizontal flue pipe 18 Burnet thermostat sensor assembly DN 15 MEASUREMENTS AND CONNECTIONS ...

Страница 17: ...mm 1345 mm 415 kg 125 L diameter 140 mm external Design values Boiler pressure Permitted boiler temperature Size of warm water accumulator Maximum length of firewood 0 5 1 5 bar Max 20 120 C 1100 2500 L 0 5 m Guarantee For Warranty Issues Ariterm Sweden AB refers to our local Distributor Removal from use A boiler that has reached the end of its useful life can be used for scrap ...

Страница 18: ...18 MANUFACTURES DECLARATION ...

Страница 19: ...19 NOTES ...

Страница 20: ...20 NOTES ...

Страница 21: ...21 NOTES ...

Страница 22: ...NOTES ...

Страница 23: ...23 NOTES ...

Страница 24: ...05 05 2011 All Rights to modifications and corrections reserved ARITERM SWEDEN AB Flottiljvägen 15 39241 Kalmar www ariterm se 0771 442850 ...

Отзывы: