1.4.1  Setting the gas pressures

1

2

Recommended pressure for 
soft-light ignition

8 mbar 

NATURAL GAS (G20)

BUTANE GAS (G30)

PROPANE GAS (G31)

16 mbar 

16 mbar

3

4

A

B

C

E

F

D

Setting the minimum and the maximum power of the boiler

1. Check that the supply pressure to the gas valve is a minimum of 20 mbar

for natural gas.

2. To do this, loosen the screw “A”.

Fit the pipe of the pressure gauge to the inlet pressure connection of the
gas valve “B”.
When you have completed this operation, replace the screw “A” securely
into its housing to seal off the gas.

3. To check the pressure supplied by the gas valve to the burner, loosen the

screw “C”. Fit the pipe of the pressure gauge to the pressure outlet test
point of the gas valve “D”.
Disconnect the compensation pipe either from the gas valve or from the
sealed chamber.

4. Push the On/Off button to “ON” position -green light- and push the Heating

button to “ON” position -green light-

Turn on the boiler by running a hot water tap.
Adjust the 10mm nut “E” on the modureg to set the maximum gas
pressure, turn the nut clockwise to increase and anti clockwise to decrease
the pressure until the required pressure is achieved (see T

ABLE

page 9)

5. To set the minimum power, disconnect a supply terminal from the modureg

and adjust screw “F”.
Turn the screw clockwise to increase the pressure and coun-
ter-clockwise to decrease the pressure (displayed on the
pressure gauge) corresponding to the minimum power (see T

ABLE

page

9).

6. When you have completed the above operations, turn off the

hot water tap, re-connect the supply terminal to the modureg
on the gas valve and replace the cap on the screw of the
modureg.

Setting the maximum heating circuit power

7. To set the maximum heating circuit power, push the On/Off button to the

“ON” position -green light- and push the Heating button and set the time
clock and any external controls to the “ON” position -green light. Turn  the
knob of the heating thermostat clockwise to maximum.

8. Remove the inspection panel of the P.C.B. and fit a small cross-head

screwdriver in to the right hand potentiometer. Turn clockwise to increase
the pressure or counter-clockwise to reduce the pressure. Adjust the
setting to the required heating pressure value (displayed on the pressure
gauge), as indicated in the charts shown in page 9.

9. Turn off the boiler by placing the main switch to the "OFF" position.

Setting pressure for soft ignition.

Disconnect the detection electrode connection close to the P.C.B. (F

IG

.

1.14).
Start the boiler and during the ignition sequence adjust the left hand
potentiometer until the gas pressure reads the required gas pressure as
per the table below.
Once the gas pressure is set turn off the boiler and re-connect the
connection to the P.C.B.

Содержание microCombi

Страница 1: ...Supplied By www heating spares co Tel 0161 620 6677 Servicing Instructions Type C Boilers G C N 47 116 16 LEAVE THESE INSTRUCTIONS WITH THE END USER Country of destination GB...

Страница 2: ...ALVE Setting the gas pressures Removing the spark generator Removing the gas valve 1 5 ACCESS TO THE WATER CIRCUIT Removing the pump pressure switch Removing the safety valve Removing the automatic ai...

Страница 3: ...ructions for removal inspection and replacement of the individual parts are given in the following pages 1 1 REPLACEMENT OF PARTS 1 2 TO GAIN GENERAL ACCESS All testing and maintenance operations on t...

Страница 4: ...ws C FIG 1 6 2 Lift the sealed chamber front cover from the locating pins FIG 1 7 FIG 1 6 C C FIG 1 7 1 2 3 Removing the side panels 1 Remove the four screws D for each side panel FIG 1 8 2 Pull the p...

Страница 5: ...FIG 1 14 3 Remove screw H FIG 1 15 4 Gently slide the electrode downward FIG 1 16 FIG 1 13 G FIG 1 14 1 3 2 Removing the burner and jets 1 Remove the screws F from the burner FIG 1 11 2 Remove the bu...

Страница 6: ...facing each other to give the correct spark gap c Check that the cables have been connected correctly d Check that the rubber gasket covers the cable electrode connection point completely FIG 1 15 FIG...

Страница 7: ...ounting plate FIG 1 26 1 3 6 Removing the fan 1 Disconnect the electrical connections K and silicone pipes L from their connection points FIG 1 20 2 Remove screws M on the top of the sealed chamber FI...

Страница 8: ...pply terminal from the modureg and adjust screw F Turn the screw clockwise to increase the pressure and coun ter clockwise to decrease the pressure displayed on the pressure gauge corresponding to the...

Страница 9: ...s G20 model 23 Regulating the heating power for butane gas G30 model 23 34 36 38 40 Regulating the heating power for propane gas G31 23 MFFI 2 78 20 11 0 2 0 1 16 2 02 Kg h 0 87 Kg h 27 5 mbar 6 2 mba...

Страница 10: ...to reset the flame failure reset a number of times during this operation 10 Remove the pipe from the pressure gauge and connect screw C to the pressure test point in order to seal off the gas 11 Care...

Страница 11: ...by using a spanner on the nut 3 Remove the pump pressure switch 1 5 ACCESS TO THE WATER CIRCUIT FIG 1 30 FIG 1 31 FIG 1 32 FIG 1 33 U V V 1 4 3 Removing the gas valve Important Before removing the gas...

Страница 12: ...ing the automatic air vent 1 Unscrew valve top Y FIG 1 35 2 Remove valve complete with float FIG 1 36 FIG 1 35 Y FIG 1 36 1 5 2 Removing the safety valve 1 Disconnect the discharge pipe work from belo...

Страница 13: ...emoving the pump 1 Remove the U clip Z FIG 1 37 2 Remove the retaining clips A1 FIG 1 38 3 Release the nut C1 FIG 1 39 4 Remove the pipe D1 FIG 1 40 5 Remove the screws E1 FIG 1 41 6 Remove the pump Z...

Страница 14: ...lease nut H1 FIG 1 45 3 Remove back nut I1 FIG 1 46 4 Remove the expansion vessel FIG 1 47 1 5 5 Removing the pressure gauge 1 Remove the U clip F1 FIG 1 42 2 Remove the pressure gauge coupling FIG 1...

Страница 15: ...mounting by releasing the securing clip FIG 1 49 1 50 1 5 8 Removing the heating temperature sensor N T C 1 Pull off the electrical connector and unscrew the sensor probe using a suitable spanner FIG...

Страница 16: ...on cover on the reverse of the control panel FIG 1 54 2 Remove the fuses FIG 1 55 FIG 1 54 FIG 1 55 M1 N1 Important Isolate the electrical supply to the boiler before accessing the control panel 1 5 1...

Страница 17: ...the P C B 4 Remove the screws R1 FIG 1 59 5 Separate the facia panel from the rear of the control panel 7 Remove the screws S1 and remove the P C B FIG 1 60 FIG 1 59 R1 R1 R1 FIG 1 60 S1 S1 1 6 2 Rem...

Страница 18: ...ww heating spares co Tel 0161 620 6677 18 2 FAULT FINDING It is possible to detect and correct any defect by using the standard fault finding diagrams described in this chapter 2 1 FAULT FINDING GUIDE...

Страница 19: ...heating spares co Tel 0161 620 6677 19 IS THE PUMP RUNNING NO NO YES YES POWER TO THE PUMP 1 Check that the pump is not stuck 2 Release replace pump 1 Check system pressure 2 Check pump cable 3 Check...

Страница 20: ...NO YES NO NO YES 1 Check replace air pressure switch 2 Check if reset button is jammed 3 Check replace flame detection electrode 1 Check replace connection cable 2 Check replace P C B 3 Check air pre...

Страница 21: ...lace detection electrode 4 Check replace P C B 1 Check replace spark generator 2 Check replace ignition electrodes and cables 3 Check spark gap 1 Check gas supply pressures 2 Check gas pressure to bur...

Страница 22: ...Supplied By www heating spares co Tel 0161 620 6677 22...

Страница 23: ...f L E D K Reset Button L Central Heating L E D M Transformer N Circulation Pump Relay O Fan Relay P Gas Valve Relay Q Spark Generator I C A01 Circulation Pump A02 Fan A03 Spark Generator Gas Valve Sup...

Страница 24: ...Supplied By www heating spares co Tel 0161 620 6677 24 microCombi 23 MFFI SE016A SF013A...

Страница 25: ...Supplied By www heating spares co Tel 0161 620 6677 25 4 SHORT SPARE PARTS LIST microCombi 23 MFFI...

Страница 26: ...Supplied By www heating spares co Tel 0161 620 6677 26...

Страница 27: ...Supplied By www heating spares co Tel 0161 620 6677 27 NOTES...

Страница 28: ...ecanati Manufacturer Merloni TermoSanitari SpA Italy Commercial subsidiary MTS GB LIMITED MTS Building Hughenden Avenue High Wycombe Bucks HP13 5FT Telephone 01494 755600 Fax 01494 459775 Internet htt...

Отзывы: