Y O U ’ L L N E E D
Assorted Torx Drivers
Phillips Head Screwdriver
Coff ee Center
Removing the Coff ee Center Chassis
T E C H N I C A L E D U C AT I O N
G R O U P P R E S E N T S
M O D E L S
MCA15NA Ariston™ Coff ee Center
MCA15APNA Ariston™ Coff ee Center
Q U E S T I O N S ?
Westland Sales
15650 SE 102nd Ave. (PO BOX 427)
Clackamas, OR 97015
Telephone: 877-356-0766
Service Fax: (503) 722-9202
Service E-mail:
[email protected]
Re-mounting the Flow Meter Housing
Make sure the Plunger
located behind the Flow
Meter Housing is properly
aligned.
Make sure
the Flow
Meter is
properly
secured in
the Flow Meter Housing.
To re-seat the Flow Meter
Housing in the Coff ee
Center, fi rst align the
Groove in the Flow Meter
Housing
with the Plunger.
Push the housing back
while making sure the
housing edge is properly
seated on Ledge next to
Plunger. Secure rear of
Flow Meter Housing by
lifting upward to snap the
clips into place
(see Figure
4-1)
. Finally, close the
Access Door.
5.
6.
7.
8.
Plunger
Aligned
To verify the ‘CLOSE DOOR’ Fault is cleared, place a cup under
the steam spout and press the Water key. Dispense at least
16 oz. of water. Next, place a cup under the brew spout and
press the Large Coff ee key to brew a cup of coff ee.
9.
NOT Aligned
Page 2 of 2
Ledge
Groove
Plunger
If the fault has cleared, reassemble the unit in reverse order of
disassembly.