SECONDARY
RETURN
COMBINATION
VALVE
EXPANSION RELIEF
PIPE
COLD
MAINS-IN
22mm
DRAIN
EXPANSION
VESSEL
PR TEMPERATURE
RELIEF VALVE
HOT SUPPLY
22mm
TUNDISH
22mm
MAX. 100mm
6
F
IG
. 2.2
2.7
C
ONNECTION OF
M
AINS
W
ATER
S
UPPLY
For Contract, Comfort and High Capacity models:
On the front of the unit there is a label to identify the connection ports.
Please check this before making any connection to the unit.
For units up to 300 litres it is recommended that all mains cold water supply
pipe work is a minimum of 22mm, with the exception of model ST50 where
15mm can be used. For 500 litre models the supply should be 28mm. An
isolating valve should be installed between the cold water supply and the
cylinder for servicing. ALL PIPEWORK MUST BE FLUSHED TO AVOID
DAMAGE TO THE CONTROL VALVES.
Please refer to F
IGS
. 2.1, 2.2, 2.3, 2.4, 2.5 for a suggested installation layout.
C
ONTRACT
STD 100-125-150-210-300 D
IRECT
COMBINATION
VALVE
EXPANSION
RELIEF
PIPE
COLD
MAINS-IN
15/22mm
EXPANSION
VESSEL
PR TEMPERATURE
RELIEF VALVE
HOT SUPPLY
15/22mm
TUNDISH
15mm
22mm
MAX. 100mm
F
IG
. 2.1
W
ALL
-
HUNG
ST 50-80-100
Содержание Contract STI 300 indirect
Страница 23: ...23 NOTES ...