28
/
COMMISSIONING
FIRST IGNITION OPERATION
1. Check the electrical
supply.
Complete ...........................................
Date
. . . . . . . . . . . . . . . . . . . . . . . .
Installer
. . . . . . . . . . . . . . . . . . . . .
2. Check the type of gas (change the gas if necessary durung
the Calibration procedure point 8).
Complete ...........................................
3. Check the gas tightness.
Complete ...........................................
7. Measure the gas inlet
static pressure.
Complete ...........................................
4. Check the Flue
Complete ...........................................
5. Fill the installation.
Complete ...........................................
6. Check the hydraulic
water tightness.
Complete ...........................................
8. Carry out the deaeration cycle and automatic calibration procedure (change gas type, if
necessary). Adjusting the CO2 by pressing the RESET button for 5 sec..
Complete ...........................................
9. Set the heating power.
Complete ...........................................
10. Balance the central
heating circuit.
Complete ...........................................
11. Check the operation in
DHW mode.
Complete ...........................................
12. Adjust DHW
fl
ow rate on
the boiler (if necessary).
Complete ...........................................
13. Check gas rate.
Complete ...........................................
14. Check the ionisation
current.
Complete ...........................................
15. Explain to the end user
the working of the boiler.
Complete ...........................................