4
Power adapter
4. Connect the power adapter to the switch as shown in the below image.
1
Cable ring
2
Cable ties
5. Position the rack against the rack posts and mount the rack to the equipment rack.
1
Screw M4x8mm
2
Rack posts
6. Secure the equipment rack using the screws.
7. For thermal purposes, make sure that there is 1RU clearance above the rack mount bracket.
20
Содержание CCS-710P-12
Страница 26: ...22 ...
Страница 30: ...26 ...
Страница 32: ...28 ...
Страница 36: ...32 ...
Страница 38: ...34 ...
Страница 40: ...36 ...
Страница 41: ...Appendix A Screw Size Details Refer to the following template for detailed screw size information 37 ...
Страница 42: ...38 ...
Страница 44: ...40 ...
Страница 46: ...42 ...
Страница 48: ...44 ...