![Ariens 991311 Скачать руководство пользователя страница 37](http://html1.mh-extra.com/html/ariens/991311/991311_operators-manual_2969905037.webp)
EN - 33
5. Slowly disconnect lift-assist springs from
spring peg on each side of deck. See
Figure
6. Remove hardware retaining drag links to
frame. See Figure
7. Remove hardware retaining deck lift links
to deck lift brackets. See Figure
8. Remove deck from under unit.
Install Deck
1. Position deck under unit.
See Figure
2. Reinstall drag links to frame with original
hardware.
3. Secure deck lift links to deck lift brackets
with original hardware.
4. Reinstall PTO belt. See
5. Reconnect lift-assist springs to spring
pegs.
6. Level the deck. See
Figure
52
1. Lift-Assist Spring
2. Spring Peg
Figure
53
Figure
54
Figure
55
Содержание 991311
Страница 49: ......
Страница 50: ...655 West Ryan Street Brillion WI 54110 www ariensco com PRINTED ...