14 Operation on an ISDN Access
ARGUS 145
PLUS
297
14.14 Managing Multiple Tests on an ISDN Access
The ARGUS can simultaneously start several tests or “connections” independently of each
other. As an example, a BERT can be run at the same time that you make a phone call.
The individual tests or “connections” use resources.
All of the tests that have been started will be administered by the Test Manager. Using the
Test Manager, you can start new tests, switch between tests running in parallel or terminate
all of the tests that are currently running.
The ARGUS - Main menu
Open the Test Manager
<TM>
or
Opens the Test Manager directly in
the Single tests menu if a
connection has already been setup
or if the ARGUS is running a test.
Test Manager