Finished
top edge
D
Assembly Instructions
10
Step
16
Step
17
Prepare the rail
Tap 2 wooden dowels
into the rail .
Insert 2 large locking
nuts into the rail .
D
6
B
6
B
B
D
6
plain chipboar
d surface
2
Finished
top edge
6
plain chipboar
d surface
6
Fit the rail
Push the rail onto the
right side .
Use a screwdriver to
tighten the large locking
nut fitted to the rail
. .
2
6
B
6
Step
18
Fit the left side
Push the left side
onto the assembly.
Use a screwdriver to
tighten the 7 large
locking nuts fitted to
the top ,base ,
shelf and rail .
1
B
3
6
4
5
Note:
Support the
rail until the left
side has been fitted
in the next step.
3
5
4
1