
Finished
front edge
Assembly Instructions
9
Step
16
Fit the left upright
Push the left upright
onto the assembly.
Use a screwdriver to
tighten the 2 large
locking nuts fitted to
the fixed shelf .
Secure the left upright
to the centre back
using 2 screws and
the allen key .
Step
17
5
E
12
5
14
G
O
O
G
G
5
12
14
U
Secure the cross rail
a:
Tap a double metal
dowel through the left
upright and into the
cross rail until it
‘’bottoms out’’.
b:
Use a screwdriver to
tighten the large locking
nut fitted to the cross
rail .
E
10
U
5
10
a:
b:
5
10
5
Step
18
Fit 6 plastic nails
Tap 3 plastic nails
into the bottom edge of
each of the uprights
and . .
R
5
6
R
R
R
R
R
R
Содержание Kids Sywell
Страница 24: ...ALR3139 ...