Finished
front edge
A
Assembly Instructions
6
Step
7
Fit runners to the
drawers
Fit the runner to the
bottom edge of the left
drawer side , as
shown, making sure that
it is pushed up against
the back of the drawer
front . Use a bradawl
to mark the fixing
positions, then secure
with 2 screws .
Fit the runner to the
bottom edge of the right
drawer side using the
same method.
Turn the drawers over
10
N c
9
8
H
N d
Runners must be
pushed up against
the drawer front
H
H
H
H
N c
N d
Prepare the left side
Tap a wooden dowel
into the left side .
Screw 3 metal dowels
into the left side .
Insert a large locking
nut into the left side
. .
Fit the runner to the
left side .
The 1st screw uses
the 2nd hole in from the
front of the runner .
The 2nd screw uses
the hole that lines up
with the other panel hole.
Fit 2 hinge plates onto
the left side , making
sure that the slot is
facing towards the
finished front edge.
Step
8
B B
B
L
L
L
I
I
N a
E
10mm
A
N a
I
Finished fr
ont edge
I
1st
screw
2nd
screw
Note:
Wooden dowels
must
not
stick out from the edge
by more than 10mm or they
may damage other panels.
E
Note:
The arrow on the
locking nut
must
point
towards the hole in the
edge of the panel.
A
1
1
B
E
1
1
N a
I
N a
I
L
1
9
10
8
x 2
1
Содержание 289/8533
Страница 20: ...ALR2742 ...