background image

Burn-out furnace APE800 and APE800a                                                       2008-06-18 

 

15 

1

5

0

3

0

0

6

5

0

7

3

0

O

O

O

O

O

C

/m

in

C

/m

in

C/

m

in

C

/m

in

C

m

in

6

0

m

in

6

0

m

in

2

4

0

m

in

3

6

0

m

in

1

2

10

10

.

 

Содержание APE 800

Страница 1: ...Kielce 229 Warszawska Street tel 48 41 368 59 59 331 62 89 www argenta pl argenta argenta pl Operation and Maintenance Manual APE 800 and APE 800a Burn out Furnaces Programming guidelines DOWNLOAD FROM WWW ARGENTA PL Kielce 2008 Date of creation June 18 2008 ...

Страница 2: ...y 4 1 11 Structural changes in the machine 4 1 12 Activities of special attention 4 1 14 Guarantee 5 1 15 Responsibilities 5 2 Intended use of the furnace 6 3 Furnace design general comments 6 4 Basic technical parameters of the furnace 7 5 Electric connection of the furnace 7 6 First launching 7 7 Temperature program selector 8 8 1 Program selector operation 9 8 2 Entering the programme 11 8 3 La...

Страница 3: ...h warnings which are mentioned in this manual 1 3 Dangers while operating the furnace The furnace was designed and constructed according to the newest technological and security standards The machine can be used only when its technical condition is perfect The usage of the device which is at variance with its purpose leads to the considerable risk of threatening the lives of people operating the m...

Страница 4: ...here the furnace is in operation should be equipped with the first aid kit containing pharmaceutical preparations used in treating burns and fire extinguisher for electric appliances 1 10 Dangers connected with the presence of electric energy all works concerning electric devices and machine power supply can be done only by an authorized electrician engineer the side lids should be always closed O...

Страница 5: ...ge of the machine improper assembly settings operation or maintenance of the machine operating the machine in which there are some damaged and or not working security devices disregarding the instruction manual unauthorized structural changes in the machine insufficient inspection of worn out parts natural disasters 1 15 Responsibilities Only the factory manager whose plant the machine was install...

Страница 6: ...er 40 mm on each wall of the chamber electric and resistance heaters and a thermocouple which is placed in the heating chamber The second unit is a temperature program selector with the semiconductor joining element RUN HLD 8888 S2 S1 8888 0 1 Fig 1 Reference drawing of the furnace The furnace is equipped with the set of heatproof ceramic tiles which constitute the panelling of the furnace ground ...

Страница 7: ...lication of all security measures The furnace is powered with the use of a three wire power grid with a single phase current The machine is equipped with a reinforced single phase plug and a suitable socket L1 N PE 8888 8888 Fig 2 Electric connection diagram 6 First launching If it is the first launching of the furnace it is advisable to dry the heating chamber To perform this action a short progr...

Страница 8: ...min it is illustrated with the rising line cooling a kind of temperature increase but in the opposite direction its value is defined with the unit o C min it is illustrated with the falling line temperature holding holding the fixed temperature which has been reached in the previous section it is defined with the time unit min it is illustrated with a straight line programme a list of subsequent s...

Страница 9: ...ease or the time of the section The bottom small display shows the current programme and the section During working parameters programming the bottom display shows the current position of programmed section and the programme RUN programme in progress HLD termination of the time counting temperature priority S2 programme no 2 S1 programme no 1 Heating signalling Confirmation of chosen functions and...

Страница 10: ...n unavailable for the user The box of the programme no 1 delay up to 1 1 min The box of the programme no 2 delay up to 1 1 min The demonstration box of the second programme fourth section temperature 302o C The indicator light is the signal of furnace heating The demonstration box of the second programme third section The HLD indicator light is the signal of time counting termination while waiting...

Страница 11: ...se of the keys and one of the available programmes should be chosen choose and press 1 program 1 2 Programming starts with the temperature increase in section 1 choose and press 1 o C min 0 10 section 1 When the increase in a section amounts more than 0 the proper furnace temperature should be set choose and press 150 o C 0 800 0 increase value will cause holding the temperature set in the previou...

Страница 12: ...ion 9 Setting the 0 values in both boxes indicates the end of the programme choose and press 360 min 0 1000 In order to come back to the main box which enables to start the programme press the key twice Programme no 1 has been saved 8 3 Launching the programme without a delay In order to start the previously entered programme immediately one has to follow the undermentioned instruction sign descri...

Страница 13: ... with the following key the analogous situation concerns programme no 2 programme no 1 While the delay function is in operation this state is indicated with the flashing sign S1 or S2 After this time the driver starts completing the default programme the analogous situation concerns programme no 2 8 5 Stopping the current programme In order to stop the current programme one should follow the under...

Страница 14: ...ation annealing programme The following drawing shows the popular tray annealing programme which consists of the sections responsible for drying annealing and casting the tray The boxes ascribed to separate sections can be helpful while programming the programme ...

Страница 15: ...Burn out furnace APE800 and APE800a 2008 06 18 15 150 300 650 730 O O O O O C m i n C m i n C m i n C m i n C min 60min 60min 240min 360min 1 2 1 0 1 0 ...

Страница 16: ...ual which confirms its origin by the serial number given by the manufacturer during transport or warehousing the furnace should be wrapped in foil and protected from humidity or damage during the time of transportation the furnace should be wrapped in a factory cardboard container which assures a proper protection transport on the pallet is advisable ...

Отзывы: